Eagle Seam Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(a)
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b)
Accumulation of combustible materials.
30 CFR 75.400
Quantity and location of firefighting equipment.
30 CFR 77.1109(a)
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(a)
Condition and examination of firefighting equipment.
30 CFR 75.1100-3
Identification of circuit breakers.
30 CFR 75.904
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a)
Atmospheric monitoring systems.
30 CFR 75.351(n)(3)
Mechanical equipment guards.
30 CFR 77.400(d) · Significant and substantial (S&S)
Regular Safety and Health Inspection
59.0 on-site hours reported
Automated Temporary Roof Support (ATRS) systems.
30 CFR 75.209(f)
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b)
Ventilation controls.
30 CFR 75.333(c)(3)
Roof bolting.
30 CFR 75.204(c)(1)
Accumulation of combustible materials.
30 CFR 75.400
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $165.00 proposed penalty
Illumination.
30 CFR 77.207 · $165.00 proposed penalty
Regular Safety and Health Inspection
49.0 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $165.00 proposed penalty
Regular Safety and Health Inspection
73.5 on-site hours reported
Use of insulated cable handling equipment.
30 CFR 75.818(b)(4) · $288.00 proposed penalty
Regular Safety and Health Inspection
43.8 on-site hours reported
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.