EAGLE NO 1 MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Ventilation controls.
30 CFR 75.333(c)(2) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $193.00 proposed penalty
Regular Safety and Health Inspection
325.5 on-site hours reported
Spot Inspection
7.8 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
EE was flipping a rock from off the top of the C/M into the conveyor boom. In the process of flipping a rock into the conveyor, the rock tilted and pinched EE's right index finger against the mine roof, causing a laceration to the right index finger.
Spot Inspection
7.5 on-site hours reported
Health Technical Investigation
10.0 on-site hours reported
Ventilation controls.
30 CFR 75.333(d)(3) · $193.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Temporary splice of trailing cable.
30 CFR 75.603 · $193.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(2) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $193.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(a)(3)(ii) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.