EAGLE NO 1 MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Fall of roof or back
Accident only
Accident narrative
An unplanned rooffall occurred on the south mains at break 69 and continued through to break 71 in the #6 entry. This is apprx 1000 feet from the 003/004 MMU. Fall Measure 20' Wide- 200' Long - 10' High. This fall does not affect ventilation or passage of persons, all approaches have been dangered off and the fall will not be rehabilitated at this time
Non-Injury Accident Investigation
14.3 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S)
Violation — cited standard not reported
Mine map.
30 CFR 75.1200 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $504.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $151.00 proposed penalty
Installation of main mine fans.
30 CFR 75.310(a)(3) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
4.5 on-site hours reported
Regular Safety and Health Inspection
55.3 on-site hours reported
Use of insulated cable handling equipment.
30 CFR 75.818(b) · $209.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $465.00 proposed penalty
Low-, medium-, or high-voltage distribution circuits and equipment; repair.
30 CFR 75.511 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Testing, examination, and maintenance of circuit breakers; record.
30 CFR 75.900-4 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Regular Safety and Health Inspection
47.0 on-site hours reported
Electrical Technical Investigation
3.0 on-site hours reported
Automatic couplers.
30 CFR 75.1405 · $151.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(a)(1)(i) · $313.00 proposed penalty
Air quality detectors and measurement devices.
30 CFR 75.320(a) · $267.00 proposed penalty
Changes in electric system map; recording.
30 CFR 75.508-2 · $165.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Violation — cited standard not reported
$3,832.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.