← DEEP MINE 46

DEEP MINE 46 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Inspection of fire suppression devices.

    violationRecord 9271045

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  2. Travelways at surface installations.

    violationRecord 9271044

    30 CFR 77.205(b) · Significant and substantial (S&S) · $267.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 9270122

    30 CFR 75.604(b) · $151.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 9271043

    30 CFR 75.400 · $151.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 9271042

    30 CFR 75.400 · $151.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9271041

    30 CFR 75.400 · $151.00 proposed penalty

  7. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9271040

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9271039

    30 CFR 75.400 · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9271038

    30 CFR 75.400 · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F003C6C

    157.0 on-site hours reported

  11. Handling of materials

    accidentRecord 220262330003

    Days restricted activity only

    Accident narrative

    Employee states EE was handing over a fuel can to another employee when EE felt a sharp pain in EE's back.

  12. Drill dust control at underground areas of underground mines.

    violationRecord 9270100

    30 CFR 72.630(b) · $151.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 9270099

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  14. Spot Inspection

    inspectionRecord F009A77

    22.5 on-site hours reported

  15. Spot Inspection

    inspectionRecord F02957E

    5.5 on-site hours reported

  16. Health Technical Investigation

    inspectionRecord F009A76

    10.0 on-site hours reported

  17. Roof control plan.

    violationRecord 9272912

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 8303601

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $226.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 9272387

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  20. Immediate notification.

    violationRecord 9272388

    30 CFR 50.10(b) · $7,555.00 proposed penalty

  21. Violation — cited standard not reported

    violationRecord 9272386
  22. Machinery

    accidentRecord 220261590040

    Days away from work only

    Accident narrative

    Employee was cleaning up the left side of cut when rock fell in the cut. Employee was standing at the second row of bolts. When the rock fell in the cut a rock rolled back and struck the employee in the right leg.

  23. Non-Fatal Accident Investigation

    inspectionRecord F011C54

    8.0 on-site hours reported

  24. Accumulation of combustible materials.

    violationRecord 9270063

    30 CFR 75.400 · $151.00 proposed penalty

  25. Roof control plan.

    violationRecord 9270062

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.