← DEEP MINE 41

DEEP MINE 41 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways; bituminous and lignite mines.

    violationRecord 8181017

    30 CFR 75.380(d)(7)(iv) · $165.00 proposed penalty

  2. Escapeways; bituminous and lignite mines.

    violationRecord 8181016

    30 CFR 75.380(d)(7)(iv) · $165.00 proposed penalty

  3. Other safeguards.

    violationRecord 8181015

    30 CFR 75.1403 · $165.00 proposed penalty

  4. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 8181014

    30 CFR 75.601-1 · $165.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 8181013

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F006287

    103(i) · 7.5 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 8284675

    30 CFR 75.400 · $267.00 proposed penalty

  8. Roof control plan.

    violationRecord 8284674

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 8284673

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 8284672

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 8284671

    30 CFR 75.400 · $267.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 8284670

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 8284669

    30 CFR 75.360(f) · $151.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 8181012

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F014943

    103(i) · 3.0 on-site hours reported

  16. Spot Inspections

    inspectionRecord F006286

    103(i) · 7.0 on-site hours reported

  17. Mine ventilation plan; submission and approval.

    violationRecord 8284668

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F014942

    103(i) · 3.5 on-site hours reported

  19. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 8284667

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 8284666

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9882974

    30 CFR 75.370(a)(1) · $165.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 8181011

    30 CFR 75.604(b) · Significant and substantial (S&S) · $366.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F006285

    716.0 on-site hours reported

  24. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F014941

    2.5 on-site hours reported

  25. Spot Inspections

    inspectionRecord F014940

    103(i) · 5.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.