Davy Branch Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $2,133.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $2,312.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $193.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $1,037.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $267.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $209.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $209.00 proposed penalty
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(1) · $465.00 proposed penalty
Regular Safety and Health Inspection
237.3 on-site hours reported
Roof Control Technical Investigation
6.8 on-site hours reported
Rock dusting.
30 CFR 75.402 · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $398.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $177.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $1,320.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.