Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(a) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(b) · $151.00 proposed penalty
Frequency of examinations.
30 CFR 75.512-2 · $1,126.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
7.3 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $755.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(c) · $3,736.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $697.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $165.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $1,126.00 proposed penalty
Violation — cited standard not reported
$1,355.00 proposed penalty
Violation — cited standard not reported
$1,252.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $336.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.