← Crucible Deep Mine

Crucible Deep Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Weekly examination.

    violationRecord 5130303

    30 CFR 75.364(h) · $151.00 proposed penalty

  2. Approval of other fire suppression devices.

    violationRecord 5130944

    30 CFR 75.1107-13(g) · $151.00 proposed penalty

  3. Protection of trailing cables.

    violationRecord 5130943

    30 CFR 75.606 · $398.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5130942

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  5. Roof control plan.

    violationRecord 5130941

    30 CFR 75.220(a)(1) · $245.00 proposed penalty

  6. Permanent splicing of trailing cables.

    violationRecord 9834799

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 9837167

    30 CFR 75.517 · $151.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 9834798

    30 CFR 75.503 · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9834794

    30 CFR 75.400 · $245.00 proposed penalty

  10. Permanent splicing of trailing cables.

    violationRecord 9834793

    30 CFR 75.604(b) · $398.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 9834792

    30 CFR 75.400 · $245.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9834791

    30 CFR 75.400 · $504.00 proposed penalty

  13. Insulating mats at power switches.

    violationRecord 9837163

    30 CFR 77.513 · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord 7048064

    144.3 on-site hours reported

  15. Health Technical Investigation

    inspectionRecord 7048259

    5.0 on-site hours reported

  16. Permissible electric face equipment; maintenance.

    violationRecord 9834782

    30 CFR 75.503 · $209.00 proposed penalty

  17. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9834781

    30 CFR 75.1106-3(a)(2) · $267.00 proposed penalty

  18. Travelways at surface installations.

    violationRecord 9834780

    30 CFR 77.205(b) · $1,320.00 proposed penalty

  19. Cable fittings; suitability.

    violationRecord 9834779

    30 CFR 77.505 · $959.00 proposed penalty

  20. Underground electrical installations.

    violationRecord 9834778

    30 CFR 75.340(a)(1)(i) · $398.00 proposed penalty

  21. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 9834777

    30 CFR 75.1101-8(a) · $267.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5091507

    30 CFR 75.503 · $151.00 proposed penalty

  23. Approval of other fire suppression devices.

    violationRecord 5091506

    30 CFR 75.1107-13(g) · $151.00 proposed penalty

  24. Ventilation controls.

    violationRecord 9839621

    30 CFR 75.333(d)(3) · $226.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5091505

    30 CFR 75.400 · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.