Crucible Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $288.00 proposed penalty
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(h) · $151.00 proposed penalty
Violation — cited standard not reported
$215.00 proposed penalty
Violation — cited standard not reported
$168.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(e) · $193.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $755.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $177.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Verbal Hazard Complaint Inspections
8.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $165.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $642.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.