COAL BRANCH NO. 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
162.3 on-site hours reported
Quarterly sampling; designated areas.
30 CFR 70.209(a) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $226.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Employee was installing a roof bolt as EE pushed the bolt up, EE used fast feed, and the bolt bent causing the bolt wrench EE was using to brake hitting EE in the mouth chipping one of EE's teeth.
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $1,126.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Main mine fan examinations and records.
30 CFR 75.312(c) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $226.00 proposed penalty
Regular Safety and Health Inspection
131.8 on-site hours reported
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Multi-gas detectors.
30 CFR 75.1714-7(a) · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(d) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.