← COAL BRANCH NO. 2

COAL BRANCH NO. 2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Roof control plan.

    violationRecord 9847415

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Regular Safety and Health Inspection

    inspectionRecord 6321495

    162.5 on-site hours reported

  3. Permanent splicing of trailing cables.

    violationRecord 9840138

    30 CFR 75.604(b) · $226.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 9840137

    30 CFR 75.604(b) · $226.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 9840136

    30 CFR 75.604(b) · $226.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 9840135

    30 CFR 75.1725(a) · $151.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 9840134

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  8. Self-rescue devices; use and location requirements.

    violationRecord 9840133

    30 CFR 75.1714-2(f) · $151.00 proposed penalty

  9. Roof bolting.

    violationRecord 9840132

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 9840131

    30 CFR 75.503 · $504.00 proposed penalty

  11. Automatic emergency-parking brakes.

    violationRecord 9840130

    30 CFR 75.523-3(b)(5) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 9840129

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9840128

    30 CFR 75.400 · $151.00 proposed penalty

  14. Condition and examination of firefighting equipment.

    violationRecord 9840127

    30 CFR 75.1100-3 · $151.00 proposed penalty

  15. Other safeguards.

    violationRecord 9840126

    30 CFR 75.1403

  16. Preshift examination at fixed intervals.

    violationRecord 9840125

    30 CFR 75.360(g) · $151.00 proposed penalty

  17. Quarterly sampling; mechanized mining units.

    violationRecord 5025150

    30 CFR 70.208(a)(2) · $226.00 proposed penalty

  18. Quarterly sampling; mechanized mining units.

    violationRecord 5025149

    30 CFR 70.208(a)(2) · $226.00 proposed penalty

  19. Roof control plan.

    violationRecord 9554295

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  20. Violation — cited standard not reported

    violationRecord 9554294
  21. Non-Injury Accident Investigation

    inspectionRecord 6322874

    11.0 on-site hours reported

  22. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9840124

    30 CFR 75.601-1 · $151.00 proposed penalty

  23. Roof control plan.

    violationRecord 9840123

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  24. Protective clothing; requirements.

    violationRecord 9840122

    30 CFR 77.1710(g) · Significant and substantial (S&S) · $3,022.00 proposed penalty

  25. Pillar recovery.

    violationRecord 9847570

    30 CFR 75.207(b)(1)(ii) · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.