Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $592.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $592.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $1,126.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(4) · $209.00 proposed penalty
Non-Fatal Accident Investigation
7.0 on-site hours reported
Installation of high-voltage transmission cables.
30 CFR 75.807 · $209.00 proposed penalty
Regular Safety and Health Inspection
158.0 on-site hours reported
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(3) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Roof testing and scaling.
30 CFR 75.211(d) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.