Coal Branch No.1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $165.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
30 CFR 75.1107-7(b) · $151.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
30 CFR 75.1107-7(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $267.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $267.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $193.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(a)(1)
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $267.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $2,133.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $2,133.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $288.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · $193.00 proposed penalty
Regular Safety and Health Inspection
143.3 on-site hours reported
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $818.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $818.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.