← Cedar Grove Mine No 3

Cedar Grove Mine No 3 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5095906

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Electrical connections or splices; suitability.

    violationRecord 5095905

    30 CFR 75.514 · $151.00 proposed penalty

  3. Electrical connections or splices; suitability.

    violationRecord 5095904

    30 CFR 75.514 · $193.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5095903

    30 CFR 75.400 · $398.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5095902

    30 CFR 75.400 · $398.00 proposed penalty

  6. Roof control plan.

    violationRecord 5097238

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5095901

    30 CFR 75.400 · $432.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5095900

    30 CFR 75.503 · $398.00 proposed penalty

  9. Electrical connections or splices; suitability.

    violationRecord 5095899

    30 CFR 75.514 · $151.00 proposed penalty

  10. Inspection of fire suppression devices.

    violationRecord 5095892

    30 CFR 75.1107-16(b) · $193.00 proposed penalty

  11. Electrical connections or splices; suitability.

    violationRecord 5095891

    30 CFR 75.514 · $193.00 proposed penalty

  12. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5095890

    30 CFR 75.1107-7(b) · $193.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5095889

    30 CFR 75.400 · $432.00 proposed penalty

  14. Permanent splicing of trailing cables.

    violationRecord 5095888

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord 7048264

    180.5 on-site hours reported

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 9837198

    30 CFR 75.512 · $151.00 proposed penalty

  17. Spot Inspection

    inspectionRecord F00CDC9

    17.5 on-site hours reported

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5092509

    30 CFR 75.512 · $245.00 proposed penalty

  19. Roof control plan.

    violationRecord 5092508

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  20. Electrical Technical Investigation

    inspectionRecord F00A102

    10.0 on-site hours reported

  21. Accumulations of combustible materials.

    violationRecord 5093422

    30 CFR 77.1104 · $151.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 5093421

    30 CFR 75.517 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  23. Approval of other fire suppression devices.

    violationRecord 5093420

    30 CFR 75.1107-13(g) · $151.00 proposed penalty

  24. Methane monitors.

    violationRecord 5093419

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 5093418

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.