  1. Mine ventilation plan; submission and approval.

    violationRecord 5132482

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 5132481

    30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5132480

    30 CFR 75.517 · $193.00 proposed penalty

  4. Electric equipment; examination, testing, and maintenance.

    violationRecord 5131222

    30 CFR 77.502 · $151.00 proposed penalty

  5. Travelways at surface installations.

    violationRecord 5131220

    30 CFR 77.205(a) · $151.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5132479

    30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 5132473

    30 CFR 75.517 · $226.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5132472

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  9. Condition and examination of firefighting equipment.

    violationRecord 5132471

    30 CFR 75.1100-3 · $151.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5132470

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  11. Permanent splicing of trailing cables.

    violationRecord 5132469

    30 CFR 75.604(b) · $226.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5132468

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  13. Roof control plan.

    violationRecord 5132467

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  14. Conventional roof support.

    violationRecord 5132466

    30 CFR 75.206(e) · $504.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5132465

    30 CFR 75.202(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5095513

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5095512

    30 CFR 75.400 · $151.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5132464

    30 CFR 75.503 · $151.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 5132463

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5132457

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  21. On-shift examination.

    violationRecord 5132456

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  22. Short circuit protection of trailing cables.

    violationRecord 5132455

    30 CFR 75.601 · $226.00 proposed penalty

  23. Permissible electric face equipment; maintenance.

    violationRecord 5132454

    30 CFR 75.503 · $151.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 5132453

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  25. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5132452

    30 CFR 75.1103-4(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.