  1. Roof control plan.

    violationRecord 5135020

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  2. Roof control plan.

    violationRecord 5092572

    30 CFR 75.220(a)(1)

  3. Protection from falls of roof, face and ribs.

    violationRecord 5092571

    30 CFR 75.202(a) · Significant and substantial (S&S)

  4. Power wires and cables; insulation and protection.

    violationRecord 5135018

    30 CFR 75.517 · Significant and substantial (S&S)

  5. Condition and examination of firefighting equipment.

    violationRecord 5135017

    30 CFR 75.1100-3

  6. Methane monitors.

    violationRecord 5135016

    30 CFR 75.342(a)(4)

  7. Permanent splicing of trailing cables.

    violationRecord 5135015

    30 CFR 75.604(b) · Significant and substantial (S&S)

  8. Methane monitors.

    violationRecord 5135014

    30 CFR 75.342(a)(4)

  9. Mine ventilation plan; submission and approval.

    violationRecord 5135013

    30 CFR 75.370(a)(1)

  10. Accumulation of combustible materials.

    violationRecord 5135012

    30 CFR 75.400

  11. Roof control plan.

    violationRecord 5135011

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  12. Drill dust control at underground areas of underground mines.

    violationRecord 5135008

    30 CFR 72.630(b) · $151.00 proposed penalty

  13. Protection of trailing cables.

    violationRecord 5135007

    30 CFR 75.606 · $288.00 proposed penalty

  14. Methane monitors.

    violationRecord 5135006

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  15. Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.

    violationRecord 5135005

    30 CFR 75.507-1(a) · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 5135004

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5135001

    30 CFR 75.604(b) · $432.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5135000

    30 CFR 75.512 · $151.00 proposed penalty

  19. Methane monitors.

    violationRecord 5133899

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  20. Roof control plan.

    violationRecord 5133898

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5133897

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5097338

    30 CFR 75.202(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  23. Violation — cited standard not reported

    violationRecord 5133881

    $839.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5133880

    30 CFR 75.1731(a) · $151.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5133879

    30 CFR 75.202(a) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.