MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

CCU Belmont Strip

ActiveSurfaceCoal (Bituminous)
MSHA MINE ID3300965
LOCATIONBelmont, OH
PUBLIC RECORD3,298 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

11

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q23
  3. 2025 Q30
  4. 2025 Q44
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q34
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

1,661.00

11 of 11 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2453
  3. 2025 Q3—
  4. 2025 Q4604
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3604
  8. 2026 Q4 *—

On-site inspection hours

172.75

8 inspections · 8 with hours

  1. 2025 Q1—
  2. 2025 Q251.25
  3. 2025 Q31.50
  4. 2025 Q477.75
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q342.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q230453.0000151.3
2025-Q300—0011.5
2025-Q440604.0000377.8
2026-Q100—000—
2026-Q200—000—
2026-Q340604.0010342.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9589620

    77.410(a)(1) · $151.00 proposed

  2. violation9589619

    77.1104 · $151.00 proposed

  3. violation9587123

    77.1110 · $151.00 proposed

  4. inspectionF02F24B

    Regular Safety and Health Inspection · 30.3 on-site hours

  5. inspectionF02F247

    Spot Inspection · 2.0 on-site hours

  6. inspectionF02F246

    Verbal Hazard Complaint Inspections · 10.0 on-site hours

  7. violation7104319

    77.1104 · $151.00 proposed

  8. accident220262020028

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    EE was striking a keeper on a loader bucket tooth and a sliver of metal broke off and lodged in their abdomen. Doctor removed it with tweezers.

  9. inspectionF01AFC4

    Spot Inspection · 5.0 on-site hours

  10. inspectionF01AFBF

    Spot Inspection · 6.0 on-site hours

  11. violation9938823

    77.1605(a) · $151.00 proposed

  12. violation9938822

    77.1110 · $151.00 proposed

  13. violation9938821

    77.1103(d) · $151.00 proposed

  14. violation9939834

    77.1605(a) · $151.00 proposed

  15. inspectionF00AAEA

    Regular Safety and Health Inspection · 66.8 on-site hours

  16. inspectionF00AAD9

    Special Emphasis Programs · 1.5 on-site hours

  17. violation9933391

    77.1103(a) · $151.00 proposed

  18. violation9933389

    77.1110 · $151.00 proposed

  19. violation9933387

    77.410(c) · $151.00 proposed

  20. inspectionF00AAD4

    Regular Safety and Health Inspection · 51.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Ccu Belmont Strip3300965 · Belmont, Ohio343,374———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYCharles C Ungurean → CCU Coal and Construction LLC → CCU Belmont Strip
HISTORY RECORDS617 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Charles C UngureancontrolsCCU Coal and Construction LLCoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
—

Westmoreland Coal CompanycontrolsOxford Mining Co LLCoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
—

Charles C UngureancontrolsOxford Mining Co LLCoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
—

Horizon Natural Resources IncorporatedcontrolsR & F Coal CompanyoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
—

Zeigler Coal Holding CompanycontrolsR & F Coal CompanyoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
—

Shell Oil CompanycontrolsR & F Coal CompanyoperatesCCU Belmont Strip

msha-controller-operator-history · controller/operator co-tenure derived on mine 3300965
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

38 historical accident/injury rows; 0 coded fatalities and 973 lost days across the published record.

ACCIDENT + INJURY RECORD4 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

172 violation rows across the full record; 34 carry an S&S flag and $35,363 appears in current assessed amounts.

ENFORCEMENT ACTIVITY35 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

724 coal dust; 44 coal quartz; 292 noise. 0 personal-sample rows have a published C/E ratio above 1; 31 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE1K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

46K employee hours and 76 summed average employees across reported subunits in the latest published quarter.

2026-Q2138K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

18 contested-violation rows, 18 civil-penalty docket/decision rows, and 6 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE42 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT5 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

108 inspection events and 6K published inspection hours across the historical record.

OVERSIGHT COVERAGE20 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records33 coal · 0 personal · 0 area
Sample status3 not voided0 voided · 0 status not reported
Mean coal quartz concentration31.67 µg/m³3 eligible measurements · 0 missing concentration
2026 · Aug 25, 2026–Aug 26, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58602675 / lab 2026035872Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION8 µg/m³3.3% quartzNot voidedNot reported
58602817 / lab 2026035866Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION78 µg/m³46.2% quartzNot voidedNot reported
58602814 / lab 2026035868Coal quartzQuartzHIGHWALL DRILL OPERATORDESIGNATED WORK POSITION9 µg/m³7.8% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION343,374short tons
LABOR HOURS
147,239
AVG EMPLOYEES
67
SUPPLY REGION
Appalachia Northern
UNION
No union code published
OPERATION
Mine only
COMPANY TYPE
Operating Subsidiary

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

TITLE 30 CROSSWALKCurrent through 2026-08-19

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
958962077.410(a)(1)Citation
958961977.1104Citation
958712377.1110Citation
710431977.1104Citation
993882377.1605(a)Citation
993882277.1110Citation
993882177.1103(d)Citation
993983477.1605(a)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustBULLDOZER OPERATOR
.03 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.114 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.248 mg/m³Not voided
Coal dustBACKHOE OPERATOR
.117 mg/m³Not voided
Coal dustREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
.035 mg/m³Not voided
NoiseBACKHOE OPERATOR
PEL dose: 0%Action-level dose: 4%
NoiseHIGHWALL DRILL OPERATOR
PEL dose: 0%Action-level dose: 17%
NoiseREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
PEL dose: 0%Action-level dose: 11%

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors38Feb 26, 2001—Jul 13, 2026mine-keyed
Addresses of Recordidentity · logistics1Dec 13, 2001—Dec 13, 2001mine-keyed
Assessed Violationscompliance · legal168Jul 19, 2004—Aug 26, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal18Jan 3, 2013—May 5, 2014mine-keyed
Coal Dust Sampleshealth · safety724May 1, 2000—Sep 1, 2026mine-keyed
Conferencescompliance · legal6Jan 3, 2013—May 23, 2016mine-keyed
Contested Violationscompliance · legal18Feb 23, 2012—Jun 25, 2012mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,262Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety262Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance6Jan 1, 1950—Feb 11, 2019mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance151Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance27Not published—Not publishedmine-keyed
Inspectionssafety · compliance108May 1, 2000—Aug 25, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment292May 8, 2000—Aug 26, 2026mine-keyed
Quartz Samples — Coalhealth · safety44Nov 16, 2000—Aug 26, 2026mine-keyed
Violationscompliance · safety · legal172Aug 7, 2003—Aug 26, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.