MSHA violations, accident reports and inspections.
Safety activity
Automated Temporary Roof Support (ATRS) systems.
30 CFR 75.209(e)(3) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Electric face equipment; deenergization.
30 CFR 75.523 · Significant and substantial (S&S) · $432.00 proposed penalty
Powered haulage
No dys awy frm wrk,no rstr act
Accident narrative
Employee was riding in the passenger seat of a mantrip when a small piece of slate contacted the employee causing a laceration that required sutures. Employee admitted drug use before treatment and was confirmed by drug test results.
Spot Inspections
103(i) · 8.0 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Transformers; installation and guarding.
30 CFR 77.509(c) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
There was a unplanned roof fall at #11 Main North C, XC 50, #10 Entry.
Non-Injury Accident Investigation
5.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Violation — cited standard not reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $193.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $245.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Spot Inspections
103(i) · 5.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.