← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5041249

    30 CFR 75.220(a)(1) · $1,219.00 proposed penalty

  2. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5041117

    30 CFR 75.1101-10 · $151.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5041116

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 9989717

    30 CFR 75.400 · $366.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9760420

    30 CFR 75.1910(j) · $151.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 5041364

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5041363

    30 CFR 75.512 · $177.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5041362

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 5041248

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  10. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5041115

    30 CFR 75.363(a) · $818.00 proposed penalty

  11. Roof control plan.

    violationRecord 5041114

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5041113

    30 CFR 75.503 · $151.00 proposed penalty

  13. Inspection of fire suppression devices.

    violationRecord 5041112

    30 CFR 75.1107-16(b) · $267.00 proposed penalty

  14. Machinery

    accidentRecord 220251270007

    Days away from work only

    Accident narrative

    Employee was operating a roof bolter on #3 unit, while on EE's knees with EE's lower leg behind EE a piece of slate struck EE's left foot twisting it causing a sprain/strain. The employee finished EE's shift but was taken off work for EE's sprain the next day.

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9989716

    30 CFR 75.1731(b) · $151.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9989715

    30 CFR 75.1731(a) · $151.00 proposed penalty

  17. Rock dusting.

    violationRecord 5041247

    30 CFR 75.402 · $245.00 proposed penalty

  18. Tests of fire hydrants and fire hose; record of tests.

    violationRecord 5041246

    30 CFR 75.1103-11 · $245.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F00FAFF

    103(i) · 6.8 on-site hours reported

  20. Accumulation of combustible materials.

    violationRecord 5041109

    30 CFR 75.400 · $398.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F00FAFD

    103(i) · 7.8 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 9989714

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  23. Cable fittings; suitability.

    violationRecord 5041245

    30 CFR 75.515 · $151.00 proposed penalty

  24. Installation of high-voltage transmission cables.

    violationRecord 5041244

    30 CFR 75.807 · $151.00 proposed penalty

  25. Methane monitors.

    violationRecord 5041108

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.