← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5041255

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  2. Installation of high-voltage transmission cables.

    violationRecord 5041254

    30 CFR 75.807 · $151.00 proposed penalty

  3. Identification of circuit breakers and disconnecting switches.

    violationRecord 5041253

    30 CFR 75.809 · $151.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 9989834

    30 CFR 75.604(c) · Significant and substantial (S&S) · $549.00 proposed penalty

  5. Roof control plan.

    violationRecord 9989833

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  6. Methane monitors.

    violationRecord 9989832

    30 CFR 75.342(a)(4) · $336.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 9989622

    30 CFR 75.1725(a) · $245.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9989621

    30 CFR 75.400 · $366.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5041374

    30 CFR 75.202(a) · $267.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5041373

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  11. Methane monitors.

    violationRecord 5041372

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 9989719

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  13. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5041371

    30 CFR 75.701 · $818.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5041370

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 5041369

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5041368

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5041252

    30 CFR 75.604(b) · Significant and substantial (S&S) · $697.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F00AE78

    103(i) · 5.3 on-site hours reported

  19. Maintenance of incombustible content of rock dust.

    violationRecord 9989718

    30 CFR 75.403 · $288.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9989620

    30 CFR 75.400 · $177.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5041367

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5041366

    30 CFR 75.503 · $151.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5041365

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  24. Criteria—Haulage; general.

    violationRecord 5041251

    30 CFR 75.1403-10(f) · Significant and substantial (S&S) · $549.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5041250

    30 CFR 75.360(b)(11)(i) · $1,219.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.