← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5041159

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  2. Maintenance of diesel-powered equipment.

    violationRecord 5041158

    30 CFR 75.1914(a) · $245.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5041235

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Roof control plan.

    violationRecord 5041234

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9760538

    30 CFR 75.1910(j) · $151.00 proposed penalty

  6. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5041157

    30 CFR 75.1107-4(a)(2)(i) · $245.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 9760537

    30 CFR 75.517 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 9760536

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F004928

    103(i) · 17.0 on-site hours reported

  10. Mine ventilation plan; submission and approval.

    violationRecord 9760268

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  11. Methane monitors.

    violationRecord 9760267

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  12. Quantity and location of firefighting equipment.

    violationRecord 5041156

    30 CFR 75.1100-2(b) · $245.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5041154

    30 CFR 75.202(a) · $267.00 proposed penalty

  14. Handtools (nonpowered)

    accidentRecord 220252330015

    Perm tot or perm prtl disablty

    Accident narrative

    Employee was attempting to remove a steering jack pin with a sledge hammer. During the process right index finger was caught between the handle of the hammer and the frame of the scoop causing a laceration. They continued to perform their normal duties until 8/13/25 when they were treated for a fracture and given 5 sutures for the laceration.

  15. Power wires and cables; insulation and protection.

    violationRecord 5045331

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5045330

    30 CFR 75.512 · $267.00 proposed penalty

  17. Inspection of fire suppression devices.

    violationRecord 5045329

    30 CFR 75.1107-16(b) · $267.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5041233

    30 CFR 75.512 · $151.00 proposed penalty

  19. Condition and examination of firefighting equipment.

    violationRecord 5041232

    30 CFR 75.1100-3 · $245.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 9765109

    30 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5046352

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  22. Quantity and location of firefighting equipment.

    violationRecord 5041231

    30 CFR 75.1100-2(f) · $245.00 proposed penalty

  23. Condition and examination of firefighting equipment.

    violationRecord 5041230

    30 CFR 75.1100-3 · $245.00 proposed penalty

  24. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5045328

    30 CFR 75.1909(b)(4) · $151.00 proposed penalty

  25. Condition and examination of firefighting equipment.

    violationRecord 5041229

    30 CFR 75.1100-3 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.