← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Methane monitors.

    violationRecord 5045171

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $818.00 proposed penalty

  2. Hoists; brakes, capability.

    violationRecord 9760567

    30 CFR 75.1400-1 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 9760279

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  4. Power wires and cables; insulation and protection.

    violationRecord 5046378

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  5. Permissible electric face equipment; maintenance.

    violationRecord 5046377

    30 CFR 75.503 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  6. Methane monitors.

    violationRecord 5046376

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $592.00 proposed penalty

  7. Identification of circuit breakers.

    violationRecord 5045170

    30 CFR 75.904 · $193.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5045169

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F017036

    103(i) · 14.5 on-site hours reported

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F009002

    4.0 on-site hours reported

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9760278

    30 CFR 75.1731(a) · $151.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 5046375

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 5046374

    30 CFR 75.604(b) · Significant and substantial (S&S) · $697.00 proposed penalty

  14. Identification check system.

    violationRecord 5045362

    30 CFR 75.1715 · $151.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5045168

    30 CFR 75.1731(a) · $336.00 proposed penalty

  16. Conventional roof support.

    violationRecord 5041039

    30 CFR 75.206(h) · $245.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F017035

    103(i) · 9.5 on-site hours reported

  18. Mine ventilation plan; submission and approval.

    violationRecord 5045361

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  19. Permanent splicing of trailing cables.

    violationRecord 5045360

    30 CFR 75.604(b) · Significant and substantial (S&S) · $697.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 5045359

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5045358

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5045357

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  23. Ventilation controls.

    violationRecord 5045356

    30 CFR 75.333(c)(2) · $151.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 5045676

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 5045167

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.