  1. Preshift examination at fixed intervals.

    violationRecord 5221051

    30 CFR 75.360(b)(3) · $3,184.00 proposed penalty

  2. Escapeways; bituminous and lignite mines.

    violationRecord 5221050

    30 CFR 75.380(d)(7)(vii)(B) · $151.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 5221049

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

  4. Roof control plan.

    violationRecord 5221048

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  5. Roof control plan.

    violationRecord 5221047

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  6. Roof control plan.

    violationRecord 5221046

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  7. Roof control plan.

    violationRecord 5221045

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5221044

    30 CFR 75.202(a) · $336.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 5045222

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5045221

    30 CFR 75.400 · $366.00 proposed penalty

  11. Permanent splicing of trailing cables.

    violationRecord 5221043

    30 CFR 75.604(b) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  12. Permissible electric equipment.

    violationRecord 5221042

    30 CFR 75.500(c) · $2,936.00 proposed penalty

  13. Maintenance of incombustible content of rock dust.

    violationRecord 5221041

    30 CFR 75.403 · $151.00 proposed penalty

  14. Air quality detectors and measurement devices.

    violationRecord 5045542

    30 CFR 75.320(c) · $151.00 proposed penalty

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5045734

    30 CFR 75.1725(a) · $245.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5045484

    30 CFR 75.517 · $549.00 proposed penalty

  17. Permissible electric face equipment; maintenance.

    violationRecord 5045483

    30 CFR 75.503 · $267.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F035D32

    103(i) · 6.0 on-site hours reported

  19. Methane monitors.

    violationRecord 5045482

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5045733

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5045541

    30 CFR 75.202(a) · $151.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5045220

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5045732

    30 CFR 75.400 · $366.00 proposed penalty

  24. Roof control plan.

    violationRecord 5045540

    30 CFR 75.220(a)(1) · $177.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F035D30

    103(i) · 3.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.