← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permanent splicing of trailing cables.

    violationRecord 5045747

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 9761797

    30 CFR 75.517 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  3. Permissible exposure level.

    violationRecord 5045746

    30 CFR 62.130(a) · $151.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 5045745

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F011E06

    103(i) · 4.0 on-site hours reported

  6. Power wires and cables; insulation and protection.

    violationRecord 9760667

    30 CFR 75.517 · Significant and substantial (S&S) · $592.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5046482

    30 CFR 75.512 · $209.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5046481

    30 CFR 75.517 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  9. Drill dust control at underground areas of underground mines.

    violationRecord 5046480

    30 CFR 72.630(b) · $209.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5046479

    30 CFR 75.517 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 5045744

    30 CFR 75.503 · $209.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F00AE90

    103(i) · 7.3 on-site hours reported

  13. Multi-gas detectors.

    violationRecord 5045234

    30 CFR 75.1714-7(a) · $151.00 proposed penalty

  14. Roof control plan.

    violationRecord 5045233

    30 CFR 75.220(a)(1) · $313.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 9761796

    30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5046478

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5045743

    30 CFR 75.604(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5045232

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F035D37

    103(i) · 6.3 on-site hours reported

  20. Accumulation of combustible materials.

    violationRecord 9760805

    30 CFR 75.400 · $151.00 proposed penalty

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5045231

    30 CFR 75.403 · $151.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5045742

    30 CFR 75.1731(a) · $226.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5045741

    30 CFR 75.202(a) · $245.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 5045555

    30 CFR 75.503 · $151.00 proposed penalty

  25. Other safeguards.

    violationRecord 5046476

    30 CFR 75.1403

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.