Bonito Pit safety activity
MSHA violations, accident reports and inspections.
Safety activity
Parking procedures for unattended equipment.
30 CFR 56.14207 · $755.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(2) · $755.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(b)(1) · $755.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Construction and maintenance of ladders.
30 CFR 56.11003 · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Guarding electrical connections and resistor grids.
30 CFR 56.12023 · $151.00 proposed penalty
Regular Safety and Health Inspection
14.3 on-site hours reported
Spot Inspection
0.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
30 CFR 50.20-1 · $151.00 proposed penalty
Machinery
Dys awy frm wrk & restrctd act
Accident narrative
While using a grinder the miner had a small piece of debris enter the corner of EE's right eye. The employee was wearing safety glasses at time of incident. Employee was taken to urgent care and released post eye doctor visit on 07/11/25. Released to return to work for next scheduled shift (07/14/25).
Securing movable parts.
30 CFR 56.14206(b) · $151.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
30 CFR 50.20(a) · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $151.00 proposed penalty
Warning signs.
30 CFR 56.4101 · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Verbal Hazard Complaint Inspections
6.5 on-site hours reported
Regular Safety and Health Inspection
17.8 on-site hours reported
Taglines, hitches, and slings.
30 CFR 56.16007(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Handtools (nonpowered)
Days away from work only
Accident narrative
While conducting R&R on a new conveyor (not energized) digging bar slid/fell onto a miner's hand causing a laceration to the miner's thumb. Initially it was believed to be controlled with gauze/bandage however due to bleed through etc the miner was sent to a clinic and was given 4 stitches to close the wound.
Protection for openings around travelways.
30 CFR 56.11012 · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $432.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(2) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.