  1. Mechanical equipment guards.

    violationRecord 5026182

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  2. Refuge alternatives.

    violationRecord 5020706

    30 CFR 75.1506(h)(2) · $1,037.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5131584

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  4. Power wires and cables; insulation and protection.

    violationRecord 5026181

    30 CFR 75.517 · $592.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5026180

    30 CFR 75.400 · $697.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 5026179

    30 CFR 75.512 · $398.00 proposed penalty

  7. Protection of trailing cables.

    violationRecord 5020705

    30 CFR 75.606 · $1,037.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020704

    30 CFR 75.1731(b) · $366.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020703

    30 CFR 75.1731(a) · $432.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F01AAAF

    103(i) · 7.8 on-site hours reported

  11. Temporary notations, revisions, and supplements.

    violationRecord 5091692

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5091691

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5026178

    30 CFR 75.503 · $504.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5020702

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F00EB3C

    103(i) · 8.0 on-site hours reported

  16. Weekly examination.

    violationRecord 5090031

    30 CFR 75.364(h) · $209.00 proposed penalty

  17. Power wires and cables; insulation and protection.

    violationRecord 5026177

    30 CFR 75.517 · $592.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5026176

    30 CFR 75.400 · $313.00 proposed penalty

  19. Roof control plan.

    violationRecord 5026175

    30 CFR 75.220(a)(1) · $245.00 proposed penalty

  20. Ventilation controls.

    violationRecord 5020701

    30 CFR 75.333(e)(1)(ii) · $465.00 proposed penalty

  21. Automatic emergency-parking brakes.

    violationRecord 5026174

    30 CFR 75.523-3(b)(2) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 5020700

    30 CFR 75.604(b) · $697.00 proposed penalty

  23. Roof control plan.

    violationRecord 5020699

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5026173

    30 CFR 75.512 · $267.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5026172

    30 CFR 75.400 · $697.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.