Berwind Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $226.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(1) · $267.00 proposed penalty
Spot Inspections
103(i) · 6.8 on-site hours reported
Spot Inspections
103(i) · 7.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Regular Safety and Health Inspection
337.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(3) · $267.00 proposed penalty
Spot Inspection
5.5 on-site hours reported
Verbal Hazard Complaint Inspections
8.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $288.00 proposed penalty
Spot Inspection
4.0 on-site hours reported
Violation — cited standard not reported
$168.00 proposed penalty
Violation — cited standard not reported
$5,716.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(b)(3) · $1,037.00 proposed penalty
Verbal Hazard Complaint Inspections
8.5 on-site hours reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Quarterly sampling; mechanized mining units.
30 CFR 70.208(b)(3) · $1,037.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.