Berwind Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeway maps.
30 CFR 75.1505(b) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $366.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $288.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Spot Inspection
30.5 on-site hours reported
Spot Inspections
103(i) · 4.0 on-site hours reported
Spot Inspections
103(i) · 4.8 on-site hours reported
Spot Inspections
103(i) · 4.5 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(4)(ii) · $2,133.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $165.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,037.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,037.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(b)(2) · $366.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $549.00 proposed penalty
Mining machines, cap lamps; requirements.
30 CFR 75.1719-4(b) · $366.00 proposed penalty
Spot Inspections
103(i) · 5.3 on-site hours reported
Spot Inspections
103(i) · 8.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.