Berwind Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 7.0 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $642.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $1,219.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $755.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(2) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $366.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $366.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection.
30 CFR 75.518 · $366.00 proposed penalty
Spot Inspections
103(i) · 7.3 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iii) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $549.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $90,649.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $20,047.00 proposed penalty
Air quality.
30 CFR 75.321(a)(1) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Immediate notification.
30 CFR 50.10(b) · $7,555.00 proposed penalty
Preservation of evidence.
30 CFR 50.12 · $336.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.