← BELCHER BRANCH

BELCHER BRANCH safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5092094

    30 CFR 75.503 · $3,736.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5092093

    30 CFR 75.512 · $4,749.00 proposed penalty

  3. Communications facilities; refuge alternatives.

    violationRecord 5092092

    30 CFR 75.1600-3(a)(1) · $959.00 proposed penalty

  4. Escapeway maps.

    violationRecord 5092091

    30 CFR 75.1505(b) · $818.00 proposed penalty

  5. Ventilation controls.

    violationRecord 5092090

    30 CFR 75.333(h) · $1,037.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F010C56

    157.8 on-site hours reported

  7. Roof control plan.

    violationRecord 5092088

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  8. Inspection of fire suppression devices.

    violationRecord 5092087

    30 CFR 75.1107-16(c) · $549.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5092086

    30 CFR 75.202(a) · $1,320.00 proposed penalty

  10. Travelways at surface installations.

    violationRecord 5092085

    30 CFR 77.205(a) · $549.00 proposed penalty

  11. Mine ventilation map.

    violationRecord 5091647

    30 CFR 75.372(a)(1) · $151.00 proposed penalty

  12. Spot Inspection

    inspectionRecord F01D4D5

    13.5 on-site hours reported

  13. Roof control plan.

    violationRecord 5095007

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5095006

    30 CFR 75.400 · $883.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F01D4D4

    103(i) · 6.5 on-site hours reported

  16. Rock dusting.

    violationRecord 5092615

    30 CFR 75.402 · $755.00 proposed penalty

  17. Roof control plan.

    violationRecord 5092614

    30 CFR 75.220(a)(1) · $2,712.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5092613

    30 CFR 75.400 · $1,968.00 proposed penalty

  19. Permanent splicing of trailing cables.

    violationRecord 5092612

    30 CFR 75.604(b) · Significant and substantial (S&S) · $15,768.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5092610

    30 CFR 77.1606(c) · $549.00 proposed penalty

  21. Loading and haulage equipment; operation.

    violationRecord 5092608

    30 CFR 77.1607(i) · $592.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F01D4D2

    103(i) · 5.5 on-site hours reported

  23. Mine ventilation plan; submission and approval.

    violationRecord 5092604

    30 CFR 75.370(a)(1) · $10,005.00 proposed penalty

  24. Roof control plan.

    violationRecord 5092603

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $90,649.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5090996

    30 CFR 75.360(a)(1) · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.