← Bedrock No. 1

Bedrock No. 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Weekly examination.

    violationRecord 5134314

    30 CFR 75.364(h)

  2. Loading and haulage equipment; installations.

    violationRecord 5134313

    30 CFR 77.1605(d)

  3. Preshift examination at fixed intervals.

    violationRecord 5133857

    30 CFR 75.360(f) · $151.00 proposed penalty

  4. Multi-gas detectors.

    violationRecord 5133856

    30 CFR 75.1714-7(a) · $151.00 proposed penalty

  5. Verbal Hazard Complaint Inspections

    inspectionRecord F022B13

    7.8 on-site hours reported

  6. Permanent splicing of trailing cables.

    violationRecord 5133849

    30 CFR 75.604(b) · Significant and substantial (S&S) · $432.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5133848

    30 CFR 75.512 · $151.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5133847

    30 CFR 75.400 · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5133846

    30 CFR 75.400 · $151.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5133845

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F01154D

    15.8 on-site hours reported

  12. Health Technical Investigation

    inspectionRecord F03DF72

    9.5 on-site hours reported

  13. Spot Inspection

    inspectionRecord 6322891

    12.8 on-site hours reported

  14. Roof control plan.

    violationRecord 9554313

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 9554312

    30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  16. Health Technical Investigation

    inspectionRecord F02EC82

    9.0 on-site hours reported

  17. Health Technical Investigation

    inspectionRecord F03DF70

    0.5 on-site hours reported

  18. Maintenance of incombustible content of rock dust.

    violationRecord 5131765

    30 CFR 75.403 · $151.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5131764

    30 CFR 75.403 · $151.00 proposed penalty

  20. Maintenance of incombustible content of rock dust.

    violationRecord 5131763

    30 CFR 75.403 · $177.00 proposed penalty

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5133226

    30 CFR 75.403 · $151.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 5133225

    30 CFR 75.403 · $151.00 proposed penalty

  23. Maintenance of incombustible content of rock dust.

    violationRecord 5133224

    30 CFR 75.403 · $151.00 proposed penalty

  24. Maintenance of incombustible content of rock dust.

    violationRecord 5133223

    30 CFR 75.403 · $151.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 5131762

    30 CFR 75.604(b) · Significant and substantial (S&S) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.