← BECKLEY POCAHONTAS MINE

BECKLEY POCAHONTAS MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6322750

    103(i) · 6.5 on-site hours reported

  2. Protection from falls of roof, face and ribs.

    violationRecord 9849749

    30 CFR 75.202(a) · $432.00 proposed penalty

  3. Weekly examination.

    violationRecord 9849748

    30 CFR 75.364(h) · $151.00 proposed penalty

  4. Roof control plan.

    violationRecord 5027909

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 5027908

    30 CFR 75.604(b) · $642.00 proposed penalty

  6. Roof control plan.

    violationRecord 5027907

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5027906

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5027905

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  9. Escapeway maps.

    violationRecord 5027904

    30 CFR 75.1505(b) · $432.00 proposed penalty

  10. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5027903

    30 CFR 75.1714-4(f) · $193.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 5027902

    30 CFR 75.380(d)(7)(vii)(A) · $193.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F020DB9

    103(i) · 6.8 on-site hours reported

  13. Methane monitors.

    violationRecord 5099396

    30 CFR 75.342(a)(4) · $697.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5099395

    30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 5027901

    30 CFR 75.380(d)(7)(vii)(A) · $432.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5027900

    30 CFR 75.517 · $642.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5022701

    30 CFR 75.512 · $245.00 proposed penalty

  18. Mechanical equipment guards.

    violationRecord 5022700

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F007062

    103(i) · 6.5 on-site hours reported

  20. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5022699

    30 CFR 75.1600-2(e) · $465.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5022698

    30 CFR 75.400 · $245.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F007061

    103(i) · 9.0 on-site hours reported

  23. Permanent splicing of trailing cables.

    violationRecord 5022697

    30 CFR 75.604(b) · $1,431.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5022696

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  25. Clamping of trailing cables to equipment.

    violationRecord 5022695

    30 CFR 75.605 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.