← BECKLEY POCAHONTAS MINE

BECKLEY POCAHONTAS MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5022713

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F00C064

    103(i) · 21.0 on-site hours reported

  3. Mine ventilation plan; submission and approval.

    violationRecord 5027919

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  4. Roof control plan.

    violationRecord 5027918

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5027917

    30 CFR 75.400 · $883.00 proposed penalty

  6. Roof control plan.

    violationRecord 5022712

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $7,084.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 5022711

    30 CFR 75.380(d)(1) · $1,037.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5022710

    30 CFR 75.202(a) · $313.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5097443

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  10. Drill dust control at underground areas of underground mines.

    violationRecord 5097442

    30 CFR 72.630(b) · $226.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F007065

    103(i) · 7.5 on-site hours reported

  12. Requirement for container labels.

    violationRecord 5027916

    30 CFR 47.41(a) · $151.00 proposed penalty

  13. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 5027915

    30 CFR 75.1103-8(a) · $432.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5027914

    30 CFR 75.1731(b) · $432.00 proposed penalty

  15. Maintenance of incombustible content of rock dust.

    violationRecord 5027913

    30 CFR 75.403 · $1,550.00 proposed penalty

  16. Maintenance of incombustible content of rock dust.

    violationRecord 5027912

    30 CFR 75.403 · $1,550.00 proposed penalty

  17. Roof control plan.

    violationRecord 5022708

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5022707

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  19. Roof control plan.

    violationRecord 5022706

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  20. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5027911

    30 CFR 75.1731(a) · $465.00 proposed penalty

  21. Permanent splicing of trailing cables.

    violationRecord 5022705

    30 CFR 75.604(b) · $193.00 proposed penalty

  22. Weekly examination.

    violationRecord 5027910

    30 CFR 75.364(h) · $151.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5022704

    30 CFR 75.400 · $549.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5022703

    30 CFR 75.517 · $1,431.00 proposed penalty

  25. Dry powder chemical systems; sensing and fire-suppression devices.

    violationRecord 5022702

    30 CFR 75.1101-16(d) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.