← BECKLEY POCAHONTAS MINE

BECKLEY POCAHONTAS MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5022674

    30 CFR 75.400 · $549.00 proposed penalty

  2. Escapeways; bituminous and lignite mines.

    violationRecord 5092942

    30 CFR 75.380(d)(1) · $288.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5029792

    30 CFR 75.604(b) · $549.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5029791

    30 CFR 75.503 · $193.00 proposed penalty

  5. Permissible electric face equipment; maintenance.

    violationRecord 5029790

    30 CFR 75.503 · $432.00 proposed penalty

  6. Spot Inspections

    inspectionRecord 6322741

    103(i) · 5.0 on-site hours reported

  7. Protection from falls of roof, face and ribs.

    violationRecord 5022673

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  8. Immediate notification.

    violationRecord 9849738

    30 CFR 50.10(d) · $151.00 proposed penalty

  9. Weekly examination.

    violationRecord 9849737

    30 CFR 75.364(b)(4) · $336.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 6322740

    103(i) · 6.5 on-site hours reported

  11. Non-Injury Accident Investigation

    inspectionRecord F01AABD

    7.5 on-site hours reported

  12. Violation — cited standard not reported

    violationRecord 5097410
  13. Accumulation of combustible materials.

    violationRecord 5022672

    30 CFR 75.400 · $432.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5022671

    30 CFR 75.202(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5022670

    30 CFR 75.202(a) · $151.00 proposed penalty

  16. Spot Inspections

    inspectionRecord 6322289

    103(i) · 8.5 on-site hours reported

  17. Methane monitors.

    violationRecord 5027857

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5027856

    30 CFR 75.202(a) · $336.00 proposed penalty

  19. Sampling; general and technical requirements.

    violationRecord 5027621

    30 CFR 90.201(b) · $1,126.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5092925

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  21. Warning signs; smoking and open flame.

    violationRecord 5027855

    30 CFR 77.1102 · $336.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5022669

    30 CFR 75.400 · $193.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5022668

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  24. Methane monitors.

    violationRecord 5092923

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  25. Other safeguards.

    violationRecord 5092922

    30 CFR 75.1403 · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.