← BECKLEY POCAHONTAS MINE

BECKLEY POCAHONTAS MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5022690

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5022689

    30 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 5022688

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  4. Atmospheric monitoring systems.

    violationRecord 5022687

    30 CFR 75.351(c)(4) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 5022686

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  6. Maintenance of incombustible content of rock dust.

    violationRecord 5022685

    30 CFR 75.403 · $209.00 proposed penalty

  7. Spot Inspections

    inspectionRecord 6322745

    103(i) · 6.0 on-site hours reported

  8. Protection from falls of roof, face and ribs.

    violationRecord 9849745

    30 CFR 75.202(a) · $313.00 proposed penalty

  9. Maintenance of incombustible content of rock dust.

    violationRecord 9849744

    30 CFR 75.403 · $549.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5022684

    30 CFR 75.400 · $366.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5022683

    30 CFR 75.400 · $366.00 proposed penalty

  12. Spot Inspections

    inspectionRecord 6322744

    103(i) · 9.0 on-site hours reported

  13. Accumulation of combustible materials.

    violationRecord 9849743

    30 CFR 75.400 · $2,133.00 proposed penalty

  14. Drill dust control at underground areas of underground mines.

    violationRecord 5027878

    30 CFR 72.630(b) · $165.00 proposed penalty

  15. Inspection of fire suppression devices.

    violationRecord 5027877

    30 CFR 75.1107-16(b) · $366.00 proposed penalty

  16. Roof control plan.

    violationRecord 5027876

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5027875

    30 CFR 75.512 · $366.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5022682

    30 CFR 75.202(a) · $151.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5022681

    30 CFR 75.403 · $549.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5022680

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  21. Ventilation controls.

    violationRecord 5022679

    30 CFR 75.333(h) · $245.00 proposed penalty

  22. Spot Inspections

    inspectionRecord 6322743

    103(i) · 8.0 on-site hours reported

  23. Protection from falls of roof, face and ribs.

    violationRecord 9849742

    30 CFR 75.202(a) · $1,037.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 5029798

    30 CFR 75.604(b) · $883.00 proposed penalty

  25. Approval of other fire suppression devices.

    violationRecord 5029797

    30 CFR 75.1107-13(f) · $336.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.