BEAR BRANCH 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Availability of approved self-rescue devices; instruction in use and location.
30 CFR 75.1714(a) · $288.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(e) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $366.00 proposed penalty
Spot Inspections
103(i) · 5.3 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Weekly examination.
30 CFR 75.364(g) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(d) · $226.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
On-shift examination.
30 CFR 75.362(d)(2) · $959.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $883.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $193.00 proposed penalty
Permissible exposure level.
30 CFR 62.130(a) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $209.00 proposed penalty
Diesel-powered equipment intended for use in underground coal mines.
30 CFR 75.1907(b)(3) · $177.00 proposed penalty
Non-Injury Accident Investigation
7.8 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.