← Bailey Mine

Bailey Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 9604520

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  2. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9604519

    30 CFR 75.1731(a) · $226.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 9604518

    30 CFR 75.1722(c) · $193.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 9604517

    30 CFR 75.400 · $288.00 proposed penalty

  5. Other safeguards.

    violationRecord 9604516

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9604454

    30 CFR 75.400 · $151.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9604453

    30 CFR 75.1731(a) · $151.00 proposed penalty

  8. Condition and examination of firefighting equipment.

    violationRecord 9604452

    30 CFR 75.1100-3 · $151.00 proposed penalty

  9. Ventilation controls.

    violationRecord 9604451

    30 CFR 75.333(h) · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9604450

    30 CFR 75.400 · $151.00 proposed penalty

  11. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 9604449

    30 CFR 75.1103-4(b) · $151.00 proposed penalty

  12. Ventilation controls.

    violationRecord 9604448

    30 CFR 75.333(h) · $151.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9604447

    30 CFR 75.1731(a) · $226.00 proposed penalty

  14. Preshift examination at fixed intervals.

    violationRecord 9604363

    30 CFR 75.360(b) · $193.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9604362

    30 CFR 75.1731(b) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9604361

    30 CFR 75.400 · $288.00 proposed penalty

  17. Power wires and cables; insulation and protection.

    violationRecord 9604569

    30 CFR 75.517 · $193.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 9604446

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9604360

    30 CFR 75.400 · $151.00 proposed penalty

  20. Permanent splicing of trailing cables.

    violationRecord 9604615

    30 CFR 75.604(b) · $151.00 proposed penalty

  21. Permissible electric face equipment; maintenance.

    violationRecord 9604614

    30 CFR 75.503 · $151.00 proposed penalty

  22. On-shift examination.

    violationRecord 9604568

    30 CFR 75.362(d)(1)(iii) · $193.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 9604567

    30 CFR 75.512 · $226.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9604566

    30 CFR 75.400 · $288.00 proposed penalty

  25. Auxiliary fans and tubing.

    violationRecord 9604445

    30 CFR 75.331(a)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.