← AUS #1

AUS #1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 9273033

    30 CFR 75.370(a)(1)

  2. Mine ventilation plan; submission and approval.

    violationRecord 8309333

    30 CFR 75.370(a)(1)

  3. Mine ventilation plan; submission and approval.

    violationRecord 8309332

    30 CFR 75.370(a)(1) · $168.00 proposed penalty

  4. Quarterly sampling; mechanized mining units.

    violationRecord 9215516

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  5. Other safeguards.

    violationRecord 9270811

    30 CFR 75.1403 · Significant and substantial (S&S) · $151.00 proposed penalty

  6. Other safeguards.

    violationRecord 9270810

    30 CFR 75.1403 · $151.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 8252416

    30 CFR 75.400 · $151.00 proposed penalty

  8. Maintenance of incombustible content of rock dust.

    violationRecord 9270809

    30 CFR 75.403 · $549.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 9270807

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  10. Roof control plan.

    violationRecord 9270806

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  11. Preshift examination at fixed intervals.

    violationRecord 9270805

    30 CFR 75.360(a)(1) · Significant and substantial (S&S) · $10,005.00 proposed penalty

  12. Boreholes in advance of mining.

    violationRecord 9270804

    30 CFR 75.388(g) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 9270803

    30 CFR 77.400(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  14. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9270802

    30 CFR 77.701 · $151.00 proposed penalty

  15. Cable fittings; suitability.

    violationRecord 9270801

    30 CFR 77.505 · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 9272911

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Roof control plan.

    violationRecord 9272910

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 9270800

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  19. Electric equipment; examination, testing, and maintenance.

    violationRecord 9270799

    30 CFR 77.502 · $151.00 proposed penalty

  20. Roof control plan.

    violationRecord 8283849

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  21. Escapeway maps.

    violationRecord 9270798

    30 CFR 75.1505(a)(4) · $151.00 proposed penalty

  22. Preshift examination at fixed intervals.

    violationRecord 9270797

    30 CFR 75.360(g) · $151.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9270796

    30 CFR 75.400 · $465.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 9270795

    30 CFR 75.1722(b) · $151.00 proposed penalty

  25. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9270794

    30 CFR 75.1731(a) · $465.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.