← AFFINITY MINE

AFFINITY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5095092

    30 CFR 75.400 · $193.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5095091

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  3. Excessive amounts of dust.

    violationRecord 5021636

    30 CFR 75.401-1 · $755.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5021635

    30 CFR 75.202(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F01AAAD

    103(i) · 7.0 on-site hours reported

  6. Mine ventilation plan; submission and approval.

    violationRecord 5091688

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5095090

    30 CFR 75.1731(b) · $151.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5095089

    30 CFR 75.202(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  9. Spot Inspection

    inspectionRecord F001906

    5.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F01FF2E

    103(i) · 8.5 on-site hours reported

  11. Accumulation of combustible materials.

    violationRecord 5095088

    30 CFR 75.400 · $193.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5095087

    30 CFR 75.400 · $193.00 proposed penalty

  13. Methane monitors.

    violationRecord 5095086

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5095085

    30 CFR 75.202(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F01FF2D

    103(i) · 9.0 on-site hours reported

  16. Mine ventilation plan; submission and approval.

    violationRecord 5095084

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5095083

    30 CFR 75.400 · $177.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5095082

    30 CFR 75.503 · $151.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5095081

    30 CFR 75.202(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  20. Machinery and equipment; operation and maintenance.

    violationRecord 5095080

    30 CFR 75.1725(a) · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5095079

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 5095078

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5095077

    30 CFR 75.400 · $177.00 proposed penalty

  24. Roof control plan.

    violationRecord 5095076

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F015091

    608.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.