Wolverine Fuels LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Requirement for container labels.
Emery Valley Mine · 420007930 CFR 47.41(a) · $193.00 proposed penalty
Inspection of fire suppression devices.
Emery Valley Mine · 420007930 CFR 75.1107-16(b) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Emery Valley Mine · 420007930 CFR 75.512 · $151.00 proposed penalty
Violation — cited standard not reported
Emery Valley Mine · 4200079$168.00 proposed penalty
Preshift examination at fixed intervals.
SUFCO · 420008930 CFR 75.360(g) · $151.00 proposed penalty
Regular Safety and Health Inspection
CASTLE VALLEY PREP PLANT · 420245510.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Emery Valley Mine · 420007930 CFR 75.1731(b) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Emery Valley Mine · 420007930 CFR 75.1731(a) · $193.00 proposed penalty
Accumulation of combustible materials.
Emery Valley Mine · 420007930 CFR 75.400 · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Emery Valley Mine · 420007930 CFR 75.1731(b) · $226.00 proposed penalty
Accumulation of combustible materials.
Emery Valley Mine · 420007930 CFR 75.400 · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
Emery Valley Mine · 420007930 CFR 75.370(a)(1) · $288.00 proposed penalty
Handling of materials
Fossil Rock Mine · 4201211No dys awy frm wrk,no rstr act
Accident narrative
Employee was cleaning up a belt splice area and employee was lowering the rollout of the belt core. Hook came off end and the core fell which caused injury to their pinky finger
Construction and repair of seals.
SUFCO · 420008930 CFR 75.337(h) · $226.00 proposed penalty
Mechanical equipment guards.
SUFCO · 420008930 CFR 77.400(a) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
SKYLINE MINE #3 · 420156630 CFR 75.1909(b)(5) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(a) · $165.00 proposed penalty
Machinery and equipment; operation and maintenance.
SKYLINE MINE #3 · 420156630 CFR 75.1725(c) · $151.00 proposed penalty
Dust accumulations in surface installations.
SKYLINE MINE #3 · 420156630 CFR 77.202 · $288.00 proposed penalty
Accumulation of combustible materials.
Emery Valley Mine · 420007930 CFR 75.400 · $165.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
SUFCO · 420008930 CFR 75.512 · $336.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
Fossil Rock Mine · 420121130 CFR 77.809 · $151.00 proposed penalty
Preshift examination at fixed intervals.
Emery Valley Mine · 420007930 CFR 75.360(b) · $642.00 proposed penalty
Quantity and location of firefighting equipment.
Emery Valley Mine · 420007930 CFR 75.1100-2(f) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.