MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Blue Knob Surface Mine4609448 · Temporarily Idled2/8 quarters reportedGreenbrier, WVSurface · MSHA: Coal (Bituminous)00003.8
Boone North No. 1 Surface Mine4608967 · Abandoned1/8 quarters reportedBoone, WVSurface · MSHA: Coal (Bituminous)00005.5
HWM 580103381 · Temporarily Idled2/8 quarters reportedNicholas, WVSurface · MSHA: Coal (Bituminous)43,90713,1906056.0
HWM 613304642 · AbandonedGreenbrier, WVSurface · MSHA: Coal (Bituminous)——00—

LOCATION

Portfolio map

4 of 4 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

6

2 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q26
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,067.00

6 of 6 violations with amounts

  1. 2025 Q1—
  2. 2025 Q22,067
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

65.25

11 inspections · 11 with hours

  1. 2025 Q1—
  2. 2025 Q253.25
  3. 2025 Q33.50
  4. 2025 Q43.50
  5. 2026 Q10.50
  6. 2026 Q24.50
  7. 2026 Q3—
  8. 2026 Q4 *0.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q2622,067.0000353.3
2025-Q300—0023.5
2025-Q400—0023.5
2026-Q100—0010.5
2026-Q200—0024.5
2026-Q300—000—
2026-Q4 *00—0010.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF035D26
    Blue Knob Surface Mine · 4609448

    Spot Inspection · 0.0 on-site hours

  2. inspectionF010565
    HWM 58 · 0103381

    Spot Inspection · 3.5 on-site hours

  3. inspectionF035D0D
    Blue Knob Surface Mine · 4609448

    Spot Inspection · 1.0 on-site hours

  4. inspectionF01C71D
    Blue Knob Surface Mine · 4609448

    Spot Inspection · 0.5 on-site hours

  5. inspectionF01C6FF
    HWM 58 · 0103381

    Regular Safety and Health Inspection · 1.0 on-site hours

  6. inspectionF011A39
    Boone North No. 1 Surface Mine · 4608967

    Regular Safety and Health Inspection · 2.5 on-site hours

  7. inspectionF01C6F0
    HWM 58 · 0103381

    Special Emphasis Programs · 0.5 on-site hours

  8. inspectionF00D663
    Boone North No. 1 Surface Mine · 4608967

    Regular Safety and Health Inspection · 3.0 on-site hours

  9. inspectionF00BF36
    HWM 58 · 0103381

    Spot Inspection · 3.0 on-site hours

  10. violation5024396
    HWM 58 · 0103381

    77.502 · $267.00 proposed

  11. violation5024395
    HWM 58 · 0103381

    77.1606(c) · $151.00 proposed

  12. violation5024394
    HWM 58 · 0103381

    77.1104 · $151.00 proposed

  13. violation5024393
    HWM 58 · 0103381

    77.1104 · $151.00 proposed

  14. violation5024392
    HWM 58 · 0103381

    77.204 · S&S · $755.00 proposed

  15. violation5024391
    HWM 58 · 0103381

    77.400(a) · S&S · $592.00 proposed

  16. inspectionF00BF2A
    HWM 58 · 0103381

    Regular Safety and Health Inspection · 48.0 on-site hours

  17. inspectionF00BF29
    Blue Knob Surface Mine · 4609448

    Spot Inspection · 2.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS257,37316 rows · 4 receiving plants
HEAT CONTENT · BTU/LB12,501Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.81 / 10.78Separate averages over measured receipts
DELIVERED COST · USD/TON111.68100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *25,54612,5780.9711.41100.42
2025-Q457,44312,6030.8310.00113.79
2026-Q173,43512,4400.8210.87112.53
2026-Q276,51312,4640.7611.15112.62
2026-Q3 *24,43612,4800.7110.50112.99
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11856 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC24,436112.9912,4800.7110.50ContractBITRail
2026-06EIA row 9960 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC37,945112.7612,4300.7310.90ContractBITRail
2026-05EIA row 8114 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC25,673113.9112,5950.8111.20ContractBITRail
2026-04EIA row 6301 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC12,895109.6412,3050.7311.80ContractBITRail
2026-03EIA row 4496 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC23,412110.5512,4050.8010.50ContractBITRail
2026-02EIA row 2530 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC13,015111.4112,4950.8110.30ContractBITRail
2026-02EIA row 2946 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Cope7210 · SC · SUNDIAL MINING LLC12,279112.9612,3050.8011.90ContractBITRail
2026-01EIA row 559 · preliminaryBOONE NORTH #1 SURFACE MINE4608967Williams3298 · SC · SUNDIAL MINING LLC24,729114.7912,5100.8511.00ContractBITRail
2025-12EIA row 34486 · finalBOONE NORTH #1 SURFACE MINE4608967Wateree3297 · SC · SUNDIAL MINING LLC11,551110.2812,5200.919.70ContractBITRail
2025-12EIA row 34493 · finalBOONE NORTH #1 SURFACE MINE4608967Williams3298 · SC · SUNDIAL MINING LLC9,597113.4012,4750.919.40ContractBITRail
2025-11EIA row 31505 · finalBOONE NORTH #1 SURFACE MINE4608967Williams3298 · SC · SUNDIAL MINING LLC11,178115.5612,6900.829.30ContractBITRail
2025-11EIA row 31998 · finalBOONE NORTH #1 SURFACE MINE4608967Cope7210 · SC · SUNDIAL MINING LLC13,041114.9312,7250.7510.20ContractBITRail
2025-10EIA row 28555 · finalBOONE NORTH #1 SURFACE MINE4608967Williams3298 · SC · SUNDIAL MINING LLC12,076114.5912,5700.7911.20ContractBITRail
2025-09EIA row 25480 · finalBOONE NORTH #1 SURFACE MINE4608967Williams3298 · SC · SUNDIAL MINING LLC12,784115.3612,7550.8311.20ContractBITRail
2025-09EIA row 25656 · finalBOONE NORTH #1 SURFACE MINE4608967John E Amos3935 · WV · RIVER TRADING6,32786.4512,5001.1911.23ContractBITRiver
2025-08EIA row 22502 · finalBOONE NORTH #1 SURFACE MINE4608967John E Amos3935 · WV · RIVER TRADING6,43584.4912,3051.0412.02ContractBITRiver
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Hwm 580103381 · Nicholas, West Virginia240,934———County sales or price not published3 eligible mines / 3 sales respondents
HWM 613304642 · Location unavailable————No matching annual production record
Boone North No. 1 Surface Mine4608967 · Location unavailable————No matching annual production record
Blue Knob Surface Mine4609448 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.