ALL STATUSES / CONTROLLER PORTFOLIO

Washington County-AR

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDM01945

MINE PORTFOLIO

8 of 8 mines and facilities

2025-01-01 – 2026-10-13. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Morrow Quarry0301790 · Intermittent6/8 quarters reportedWashington, ARSurface · MSHA: Crushed, Broken Limestone NEC07,02610025.0
Bethel Grove Quarry And Plant0301499 · AbandonedWashington, ARSurface · MSHA: Crushed, Broken Limestone NEC——00—
BLACK OAK QUARRY0301570 · AbandonedWashington, ARSurface · MSHA: Dimension Limestone——00—
Bush Valley Quarry0301547 · AbandonedWashington, ARSurface · MSHA: Dimension Limestone——00—
Cove Creek Pit And Plant0301168 · AbandonedWashington, ARSurface · MSHA: Construction Sand and Gravel——00—
Dr Ray Mine0300893 · AbandonedWashington, ARSurface · MSHA: Construction Sand and Gravel——00—
Durham Quarry And Plant0301519 · AbandonedWashington, ARSurface · MSHA: Crushed, Broken Limestone NEC——00—
Goshen Tuttle Quarry0301998 · AbandonedWashington, ARSurface · MSHA: Crushed, Broken Stone NEC——00—

LOCATION

Portfolio map

2 of 8 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

10

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q26
  3. 2025 Q31
  4. 2025 Q43
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

1,536.00

10 of 10 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2906
  3. 2025 Q3177
  4. 2025 Q4453
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

25.00

3 inspections · 3 with hours

  1. 2025 Q1—
  2. 2025 Q26.00
  3. 2025 Q311.50
  4. 2025 Q47.50
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q260906.000016.0
2025-Q310177.0000111.5
2025-Q430453.000017.5
2026-Q100—000—
2026-Q200—000—
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspection6804565
    Morrow Quarry · 0301790

    Regular Safety and Health Inspection · 7.5 on-site hours

  2. violation5170424
    Morrow Quarry · 0301790

    56.4104(b) · $151.00 proposed

  3. violation5170423
    Morrow Quarry · 0301790

    56.14112(b) · $151.00 proposed

  4. violation5170422
    Morrow Quarry · 0301790

    56.14132(b)(1) · $151.00 proposed

  5. inspectionF022A0D
    Morrow Quarry · 0301790

    Spot Inspection · 11.5 on-site hours

  6. violation5009030
    Morrow Quarry · 0301790

    50.30(a) · $177.00 proposed

  7. inspection6938260
    Morrow Quarry · 0301790

    Regular Safety and Health Inspection · 6.0 on-site hours

  8. violation9792831
    Morrow Quarry · 0301790

    46.9(a) · $151.00 proposed

  9. violation9792830
    Morrow Quarry · 0301790

    56.14112(a)(1) · $151.00 proposed

  10. violation9792829
    Morrow Quarry · 0301790

    56.11001 · $151.00 proposed

  11. violation9792828
    Morrow Quarry · 0301790

    56.14207 · $151.00 proposed

  12. violation9792827
    Morrow Quarry · 0301790

    56.4200(b)(2) · $151.00 proposed

  13. violation9792826
    Morrow Quarry · 0301790

    47.41(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.