ACTIVE / CONTROLLER PORTFOLIO

Warrior Met Coal Intermediate Holdco LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0124421

MINE PORTFOLIO

4 of 4 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Blue Creek Mine No. 10103448 · Active6/8 quarters reportedTuscaloosa, ALUnderground · MSHA: Coal (Bituminous)4,612,897921,677759173,778.5
Blue Creek Processing0103609 · Active5/8 quarters reportedTuscaloosa, ALFacility · MSHA: Coal (Bituminous)0109,933262159.5
No 4 Mine0101247 · Active6/8 quarters reportedTuscaloosa, ALUnderground · MSHA: Coal (Bituminous)4,628,7611,564,102925256,417.0
No 7 Mine0101401 · Active6/8 quarters reportedJefferson, ALUnderground · MSHA: Coal (Bituminous)7,805,5072,674,2051,343349,994.0

LOCATION

Portfolio map

4 of 4 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

3,053

868 significant & substantial (S&S)

  1. 2025 Q1387
  2. 2025 Q2552
  3. 2025 Q3470
  4. 2025 Q4446
  5. 2026 Q1361
  6. 2026 Q2343
  7. 2026 Q3432
  8. 2026 Q4 *62

Accident records

78

1 records classified as fatality

  1. 2025 Q110
  2. 2025 Q214
  3. 2025 Q310
  4. 2025 Q418
  5. 2026 Q110
  6. 2026 Q26
  7. 2026 Q310
  8. 2026 Q4 *0

Proposed penalties · USD

2,816,901.00

2,899 of 3,053 violations with amounts

  1. 2025 Q1241,287
  2. 2025 Q2548,446
  3. 2025 Q3403,014
  4. 2025 Q4399,573
  5. 2026 Q1356,985
  6. 2026 Q2336,978
  7. 2026 Q3530,618
  8. 2026 Q4 *—

On-site inspection hours

20,349.00

495 inspections · 495 with hours

  1. 2025 Q12,798.75
  2. 2025 Q22,956.75
  3. 2025 Q32,833.00
  4. 2025 Q42,745.25
  5. 2026 Q12,796.00
  6. 2026 Q22,909.50
  7. 2026 Q33,076.00
  8. 2026 Q4 *233.75
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q138795241,287.00100652,798.8
2025-Q2552170548,446.00140582,956.8
2025-Q3470115403,014.00100652,833.0
2025-Q4446120399,573.00180682,745.3
2026-Q136199356,985.00100782,796.0
2026-Q234396336,978.0060672,909.5
2026-Q3432151530,618.00101793,076.0
2026-Q4 *6222—0015233.8

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5060663
    No 7 Mine · 0101401

    75.400 · $336.00 proposed

  2. violation5060662
    No 7 Mine · 0101401

    75.1202-1(b)(3) · $151.00 proposed

  3. inspection6974475
    No 7 Mine · 0101401

    103(i) Spot Inspections · 7.0 on-site hours

  4. violation9828856
    No 7 Mine · 0101401

    75.807 · $267.00 proposed

  5. violation5060660
    No 7 Mine · 0101401

    47.41(a)(1) · $177.00 proposed

  6. violation5060659
    No 7 Mine · 0101401

    77.208(e) · $267.00 proposed

  7. accident220250500001
    No 7 Mine · 0101401

    FALL OF ROOF OR BACK · ACCIDENT ONLY

    Accident narrative

    Roof Fall - Occurred in the North West Mains track entry (#3 entry) at x-cut 143. The roof fall area measured 40' long x 40' wide x 8'10" in height and fell above the anchorage bolt.

  8. inspection6975850
    No 7 Mine · 0101401

    Non-Injury Accident Investigation · 8.0 on-site hours

  9. violation9822479
    No 7 Mine · 0101401

    Description not reported

  10. violation9825860
    No 7 Mine · 0101401

    75.321(a)(2) · $592.00 proposed

  11. violation5060658
    No 7 Mine · 0101401

    75.380(d)(7)(iv) · S&S · $883.00 proposed

  12. violation5060657
    No 7 Mine · 0101401

    75.1505(b) · $151.00 proposed

  13. violation9824082
    Blue Creek Mine No. 1 · 0103448

    75.202(a) · $151.00 proposed

  14. violation9824081
    Blue Creek Mine No. 1 · 0103448

    75.220(a)(1) · $151.00 proposed

  15. violation9824080
    Blue Creek Mine No. 1 · 0103448

    75.220(a)(1) · S&S · $1,818.00 proposed

  16. violation9824079
    Blue Creek Mine No. 1 · 0103448

    75.202(a) · $151.00 proposed

  17. inspection6976138
    No 4 Mine · 0101247

    103(i) Spot Inspections · 9.5 on-site hours

  18. violation9769405
    No 4 Mine · 0101247

    75.400 · $818.00 proposed

  19. violation9769067
    No 4 Mine · 0101247

    75.342(a)(4) · S&S · $1,126.00 proposed

  20. violation9825859
    No 7 Mine · 0101401

    75.1722(a) · S&S · $1,320.00 proposed

  21. violation9828855
    No 7 Mine · 0101401

    75.1731(b) · $193.00 proposed

  22. violation9828854
    No 7 Mine · 0101401

    75.400 · $366.00 proposed

  23. violation9828853
    No 7 Mine · 0101401

    75.400 · $366.00 proposed

  24. violation5060656
    No 7 Mine · 0101401

    Description not reported · $168.00 proposed

  25. violation5060655
    No 7 Mine · 0101401

    75.1914(a) · $177.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Coal shipments and quality

EIA source checks are overdue. Refresh receipts before serving this report.

Coal prices and estimated revenue

Annual coal-price source checks are overdue. Refresh before serving estimates.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.