Warrior Met Coal Intermediate Holdco LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(b)(3) · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
No 7 Mine · 010140130 CFR 75.380(d)(1) · $226.00 proposed penalty
Other safeguards.
No 7 Mine · 010140130 CFR 75.1403 · $336.00 proposed penalty
Preshift examination at fixed intervals.
No 7 Mine · 010140130 CFR 75.360(g) · $151.00 proposed penalty
Spot Inspections
No 4 Mine · 0101247103(i) · 7.8 on-site hours reported
Spot Inspections
No 7 Mine · 0101401103(i) · 10.0 on-site hours reported
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Atmospheric monitoring systems.
No 4 Mine · 010124730 CFR 75.351(b)(3) · $151.00 proposed penalty
Atmospheric monitoring systems.
No 4 Mine · 010124730 CFR 75.351(e)(1)(ii) · $288.00 proposed penalty
Permanent splicing of trailing cables.
No 7 Mine · 010140130 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Roof control plan.
No 7 Mine · 010140130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Escapeway maps.
No 7 Mine · 010140130 CFR 75.1505(b) · $226.00 proposed penalty
Handtools (nonpowered)
No 4 Mine · 0101247Days away from work only
Accident narrative
Employee was putting connecting links in face chain and hit EE's thumb with a hammer causing injury
Roof Control Technical Investigation
Blue Creek Mine No. 1 · 010344823.0 on-site hours reported
Atmospheric monitoring systems.
No 4 Mine · 010124730 CFR 75.351(n)(4) · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 4 Mine · 010124730 CFR 75.403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 7 Mine · 010140130 CFR 75.403 · $288.00 proposed penalty
Illumination in working places.
Blue Creek Mine No. 1 · 010344830 CFR 75.1719-1(e)(5)(ii) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
Blue Creek Mine No. 1 · 010344830 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $642.00 proposed penalty
Preshift examination at fixed intervals.
Blue Creek Mine No. 1 · 010344830 CFR 75.360(g) · $151.00 proposed penalty
Clamping of trailing cables to equipment.
No 4 Mine · 010124730 CFR 75.605 · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
No 4 Mine · 010124730 CFR 75.1725(a) · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
No 7 Mine · 010140130 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.