Thomas J Loving; Joseph T Bennett Jr; Andrew T Loving safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
N R G · 151239927.5 on-site hours reported
Regular Safety and Health Inspection
PARAGON LOADOUT · 440694337.5 on-site hours reported
Mobile equipment; automatic warning devices.
PARAGON LOADOUT · 440694330 CFR 77.410(a)(1) · Significant and substantial (S&S) · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
PARAGON LOADOUT · 440694330 CFR 77.404(a) · Significant and substantial (S&S) · $209.00 proposed penalty
Handtools (nonpowered)
PARAGON LOADOUT · 4406943No dys awy frm wrk,no rstr act
Accident narrative
Employee was removing a grease hose from a bearing on a coal feeder when the wrench EE was using slipped and mashed EE's right ring finger between the wrench and the guard on the coal feeder bearing causing a cut to EE's finger requiring 2 stitches and returned back to work 3 hours later
Travelways at surface installations.
Totz Prep Plant · 151065730 CFR 77.205(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Totz Prep Plant · 151065782.5 on-site hours reported
Highwalls, pits and spoil banks; plans.
River Ridge P-1 · 151989530 CFR 77.1000 · Significant and substantial (S&S) · $697.00 proposed penalty
Spot Inspection
River Ridge P-1 · 151989533.0 on-site hours reported
Loading and haulage equipment; installations.
Hances Ridge Split #1 · 151989130 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Hances Ridge Split #1 · 151989130 CFR 77.1605(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
Hances Ridge Split #1 · 151989178.3 on-site hours reported
Storage of materials.
Hances Ridge Split #1 · 151989130 CFR 77.208(e) · $151.00 proposed penalty
Impoundment Spot Inspection
Totz Prep Plant · 15106576.8 on-site hours reported
Spot Inspection
River Ridge P-1 · 15198955.0 on-site hours reported
Spot Inspection
River Ridge P-1 · 15198955.0 on-site hours reported
Spot Inspection
Totz Prep Plant · 15106572.0 on-site hours reported
Spot Inspection
N R G · 15123992.0 on-site hours reported
Spot Inspection
PARAGON LOADOUT · 440694323.0 on-site hours reported
Waiver of surface facilities requirements; posting of waiver.
River Ridge P-1 · 151989530 CFR 71.403(c) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
PARAGON LOADOUT · 440694330 CFR 77.1110 · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
PARAGON LOADOUT · 440694330 CFR 77.410(c) · Significant and substantial (S&S) · $313.00 proposed penalty
Mobile equipment; automatic warning devices.
PARAGON LOADOUT · 440694330 CFR 77.410(c) · Significant and substantial (S&S) · $366.00 proposed penalty
Loading and haulage equipment; installations.
PARAGON LOADOUT · 440694330 CFR 77.1605(b) · $151.00 proposed penalty
Loading and haulage equipment; installations.
PARAGON LOADOUT · 440694330 CFR 77.1605(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.