ACTIVE / CONTROLLER PORTFOLIO

Texas United Corp

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDM00582

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CARLSBAD LAKE PLANT2901042 · Active6/8 quarters reportedEddy, NMSurface · MSHA: Salt, Brine Evaporated040,04433142.5
CARLSBAD PLANT2901043 · Active6/8 quarters reportedEddy, NMSurface · MSHA: Salt, Brine Evaporated0162,18239889.8
HOCKLEY MINE4102478 · Active6/8 quarters reportedHarris, TXUnderground · MSHA: Salt0187,489295218.8

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

101

14 significant & substantial (S&S)

  1. 2025 Q125
  2. 2025 Q23
  3. 2025 Q324
  4. 2025 Q45
  5. 2026 Q131
  6. 2026 Q23
  7. 2026 Q310
  8. 2026 Q4 *0

Accident records

14

1 records classified as fatality

  1. 2025 Q13
  2. 2025 Q24
  3. 2025 Q31
  4. 2025 Q42
  5. 2026 Q12
  6. 2026 Q20
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

58,869.00

97 of 101 violations with amounts

  1. 2025 Q17,407
  2. 2025 Q2453
  3. 2025 Q313,572
  4. 2025 Q41,150
  5. 2026 Q120,420
  6. 2026 Q211,868
  7. 2026 Q33,999
  8. 2026 Q4 *—

On-site inspection hours

351.00

20 inspections · 20 with hours

  1. 2025 Q163.50
  2. 2025 Q234.25
  3. 2025 Q369.25
  4. 2025 Q459.00
  5. 2026 Q147.75
  6. 2026 Q224.75
  7. 2026 Q352.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q12547,407.0030463.5
2025-Q230453.0040134.3
2025-Q324513,572.0010369.3
2025-Q4511,150.0021359.0
2026-Q131320,420.0020447.8
2026-Q23111,868.0000124.8
2026-Q31003,999.0020452.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF01AD37
    CARLSBAD PLANT · 2901043

    Regular Safety and Health Inspection · 18.5 on-site hours

  2. violation5171731
    CARLSBAD PLANT · 2901043

    56.11012 · $151.00 proposed

  3. violation5171730
    CARLSBAD PLANT · 2901043

    56.11012 · $151.00 proposed

  4. violation5171729
    CARLSBAD PLANT · 2901043

    56.20003(c) · $151.00 proposed

  5. violation5171728
    CARLSBAD PLANT · 2901043

    56.14100(b) · $151.00 proposed

  6. violation5171727
    CARLSBAD PLANT · 2901043

    56.14132(b)(1)(iii) · $151.00 proposed

  7. violation5171726
    CARLSBAD PLANT · 2901043

    56.14100(b) · $151.00 proposed

  8. violation5171725
    CARLSBAD PLANT · 2901043

    56.14101(a)(2) · $151.00 proposed

  9. violation5171724
    CARLSBAD PLANT · 2901043

    56.12002 · $151.00 proposed

  10. violation5171723
    CARLSBAD PLANT · 2901043

    56.20003(a) · $151.00 proposed

  11. violation5171722
    CARLSBAD PLANT · 2901043

    56.11012 · $151.00 proposed

  12. violation5171721
    CARLSBAD PLANT · 2901043

    56.14112(b) · $151.00 proposed

  13. violation5171720
    CARLSBAD PLANT · 2901043

    56.11012 · $151.00 proposed

  14. violation5171719
    CARLSBAD PLANT · 2901043

    56.20003(a) · $151.00 proposed

  15. violation5171718
    CARLSBAD PLANT · 2901043

    56.14112(a)(1) · $151.00 proposed

  16. violation5171717
    CARLSBAD PLANT · 2901043

    56.11012 · S&S · $398.00 proposed

  17. violation5171716
    CARLSBAD PLANT · 2901043

    56.12032 · $151.00 proposed

  18. violation5171715
    CARLSBAD PLANT · 2901043

    56.20011 · $151.00 proposed

  19. violation5171714
    CARLSBAD PLANT · 2901043

    56.14112(b) · $151.00 proposed

  20. violation5171713
    CARLSBAD PLANT · 2901043

    56.14100(b) · $151.00 proposed

  21. accident220260890023
    CARLSBAD PLANT · 2901043

    HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    03/13/26, at 8:00 PM, EE was unclogging bin #3 when a salt rock moved into the chute. Causing the employee's hand and bar to move downward. The employee's left hand struck the side railing of the chute on bin #3, impacting the lower left side of EE's left ring finger. On 03/16/26 a X-ray report indicated a closed displaced fracture of distal phalanx of left ring finger.

  22. accident220260680006
    CARLSBAD PLANT · 2901043

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    While poking a silo the employee struck the top of EE's left hand on the spout piece, resulting in discomfort. As EE was walking down the steps, EE hit the top of left hand as well, causing further discomfort.

  23. inspection6804576
    CARLSBAD LAKE PLANT · 2901042

    Regular Safety and Health Inspection · 6.0 on-site hours

  24. violation5170450
    CARLSBAD LAKE PLANT · 2901042

    56.14100(b) · $267.00 proposed

  25. violation5170449
    CARLSBAD LAKE PLANT · 2901042

    56.14100(b) · $267.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.