Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Atoka Quarry3402026 · Active6/8 quarters reported | Atoka, OKSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 36,196 | 3 | 0 | 29.8 |
| Benjamin4202528 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 26,325 | 8 | 1 | 18.8 |
| Bluffdale Pit4202179 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 56,197 | 10 | 1 | 31.5 |
| Brigham Pit4202523 · Active6/8 quarters reported | Box Elder, UTSurface · MSHA: Construction Sand and Gravel | 0 | 12,002 | 14 | 0 | 28.5 |
| Coleman Quarry-SCS Materials3402240 · Active6/8 quarters reported | Atoka, OKSurface · MSHA: Dimension Limestone | 0 | 18,816 | 15 | 1 | 40.3 |
| Columbus Plant4104393 · Active6/8 quarters reported | Colorado, TXSurface · MSHA: Construction Sand and Gravel | 0 | 114,329 | 5 | 1 | 33.0 |
| Crusher LU300-LU4004102577 · Active6/8 quarters reported | Glasscock, TXSurface · MSHA: Crushed, Broken Stone NEC | 0 | 59,424 | 7 | 1 | 45.0 |
| Duncan Plant4105187 · Active6/8 quarters reported | Colorado, TXSurface · MSHA: Sand, Industrial NEC | 0 | 60,764 | 7 | 2 | 28.8 |
| Durbin Quarry1401719 · Active6/8 quarters reported | Elk, KSSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 53,668 | 6 | 0 | 26.8 |
| Eagle Lake Plant4104889 · Active6/8 quarters reported | Colorado, TXSurface · MSHA: Construction Sand and Gravel | 0 | 39,728 | 7 | 1 | 39.5 |
| Ellinger Plant4104154 · Active6/8 quarters reported | Fayette, TXSurface · MSHA: Construction Sand and Gravel | 0 | 36,869 | 4 | 0 | 37.5 |
| Erda Pit4201479 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 6,406 | 0 | 0 | 8.0 |
| Grantsville Pit4202637 · Active6/8 quarters reported | Tooele, UTSurface · MSHA: Construction Sand and Gravel | 0 | 20,412 | 24 | 0 | 45.0 |
| Hanna's Bend Plant4104631 · Active6/8 quarters reported | Liberty, TXSurface · MSHA: Construction Sand and Gravel | 0 | 61,911 | 8 | 1 | 32.5 |
| Hays Quarry4104514 · Active6/8 quarters reported | Hays, TXSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 60,574 | 7 | 2 | 42.3 |
| Herriman Pit4201823 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 12,948 | 4 | 0 | 21.5 |
| HIGHLAND PIT4200941 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 36,754 | 19 | 3 | 35.8 |
| Hockley Plant4103491 · Active6/8 quarters reported | Harris, TXSurface · MSHA: Construction Sand and Gravel | 0 | 16,944 | 9 | 0 | 34.0 |
| Hyrum Pit4202360 · Active6/8 quarters reported | Cache, UTSurface · MSHA: Construction Sand and Gravel | 0 | 35,721 | 12 | 0 | 36.5 |
| Maryland Creek0503800 · Active6/8 quarters reported | Summit, COSurface · MSHA: Construction Sand and Gravel | 0 | 25,020 | 17 | 0 | 48.3 |
| MONA PIT4202212 · Active6/8 quarters reported | Juab, UTSurface · MSHA: Construction Sand and Gravel | 0 | 46,643 | 8 | 0 | 37.8 |
| Oxford Sand and Gravel1400522 · Active6/8 quarters reported | Sumner, KSSurface · MSHA: Construction Sand and Gravel | 0 | 36,542 | 18 | 0 | 61.0 |
| Parley's Stone4202102 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 26,978 | 11 | 0 | 41.8 |
| Pit #1 43rd Ave0202867 · Active6/8 quarters reported | Maricopa, AZSurface · MSHA: Construction Sand and Gravel | 0 | 93,688 | 16 | 3 | 35.3 |
| Plant 1 Avondale0203390 · Active6/8 quarters reported | Maricopa, AZSurface · MSHA: Construction Sand and Gravel | 0 | 28,975 | 19 | 1 | 33.5 |
| Pope's Point3401930 · Active6/8 quarters reported | Bryan, OKSurface · MSHA: Sand, Industrial NEC | 0 | 103,736 | 5 | 0 | 45.5 |
| Portable Plant #21401463 · Active6/8 quarters reported | Crawford, KSSurface · MSHA: Crushed, Broken Stone NEC | 0 | 28,394 | 1 | 2 | 32.3 |
| Portable Plant #31401464 · Active6/8 quarters reported | Wilson, KSSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 26,017 | 7 | 0 | 33.0 |
| Portable Plant #61401828 · Active6/8 quarters reported | Neosho, KSSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 38,719 | 3 | 1 | 33.3 |
| Sawyer Quarry3401950 · Active6/8 quarters reported | Choctaw, OKSurface · MSHA: Crushed, Broken Sandstone | 0 | 233,973 | 11 | 0 | 87.5 |
| SEVERY QUARRY1401584 · Active6/8 quarters reported | Greenwood, KSSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 36,822 | 7 | 0 | 30.0 |
| Smith Plant4105210 · Active6/8 quarters reported | Colorado, TXSurface · MSHA: Crushed, Broken Stone NEC | 0 | 93,064 | 6 | 0 | 36.8 |
| SPRING PLANT4105125 · Active6/8 quarters reported | Harris, TXSurface · MSHA: Construction Sand and Gravel | 0 | 32,124 | 6 | 2 | 40.5 |
| STEWART STONE MITCHELL3401400 · Active6/8 quarters reported | Pawnee, OKSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 61,989 | 15 | 0 | 37.8 |
| Stockton Pit4202480 · Active6/8 quarters reported | Tooele, UTSurface · MSHA: Construction Sand and Gravel | 0 | 51,526 | 10 | 1 | 34.5 |
| Vines Sand & Gravel4103348 · Active6/8 quarters reported | Ward, TXSurface · MSHA: Construction Sand and Gravel | 0 | 32,749 | 4 | 0 | 35.5 |
| Vox Plant4105081 · Active6/8 quarters reported | Colorado, TXSurface · MSHA: Construction Sand and Gravel | 0 | 83,837 | 5 | 0 | 22.8 |
| Washplant 40503809 · Active6/8 quarters reported | La Plata, COSurface · MSHA: Construction Sand and Gravel | 0 | 3,961 | 3 | 0 | 15.5 |
| Wegenhoft Plant4102916 · Active6/8 quarters reported | Fayette, TXSurface · MSHA: Construction Sand and Gravel | 0 | 39,531 | 4 | 0 | 38.0 |
| Wichita Sand and Gravel1400543 · Active6/8 quarters reported | Sedgwick, KSSurface · MSHA: Construction Sand and Gravel | 0 | 40,064 | 30 | 0 | 64.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
40 of 40 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 40 mines listed under this controller were checked; 40 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 273,813 | 0.00 | 542 | 40/40 mines reporting |
| 2025 Q2 | 0 | 295,535 | 0.00 | 531 | 40/40 mines reporting |
| 2025 Q3 | 0 | 324,384 | 0.00 | 536 | 40/40 mines reporting |
| 2025 Q4 | 0 | 304,023 | 0.00 | 560 | 40/40 mines reporting |
| 2026 Q1 | 0 | 371,673 | 0.00 | 523 | 40/40 mines reporting |
| 2026 Q2 | 0 | 360,912 | 0.00 | 501 | 40/40 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
53 significant & substantial (S&S)
0 records classified as fatality
365 of 375 violations with amounts
188 inspections · 188 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 45 | 9 | 10,989.00 | 2 | 0 | 25 | 219.5 |
| 2025-Q2 | 92 | 12 | 30,947.00 | 0 | 0 | 31 | 261.3 |
| 2025-Q3 | 40 | 6 | 14,793.00 | 5 | 0 | 27 | 163.5 |
| 2025-Q4 | 45 | 11 | 34,389.00 | 3 | 0 | 24 | 170.3 |
| 2026-Q1 | 77 | 8 | 29,524.00 | 6 | 0 | 31 | 253.8 |
| 2026-Q2 | 38 | 3 | 13,431.00 | 4 | 0 | 23 | 173.8 |
| 2026-Q3 | 38 | 4 | 9,378.00 | 4 | 0 | 26 | 217.8 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 0.0 on-site hours
Compliance Follow-up Inspection · 0.0 on-site hours
Regular Safety and Health Inspection · 3.0 on-site hours
56.4101
56.14207 · S&S
103 (g) Written Notification Hazard Complaint Inspectio · 2.0 on-site hours
Spot Inspection · 9.8 on-site hours
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
Employee was rearranging conveyor rollers on a shelf and mashed EE's finger between the roller and the wooden shelf divider.
Regular Safety and Health Inspection · 5.0 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 3.0 on-site hours
56.9300(b) · S&S
56.4101 · $959.00 proposed
Regular Safety and Health Inspection · 12.3 on-site hours
50.20(a) · $151.00 proposed
56.12004 · $366.00 proposed
56.12023
50.20(a) · $151.00 proposed
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Employee was assisting with uprighting a 55-gallon drum of hydraulic oil causing them to sprain their right hand.
Regular Safety and Health Inspection · 14.3 on-site hours
56.14100(b)
56.4102 · S&S
56.4102
56.20003(a) · $313.00 proposed
56.4102 · $465.00 proposed
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
EE was installing a hydraulic hose on a John Deere Loader. EE had to use extra force to connect the hydraulic hose since it was also in an a tough angle to get to. The extra force and oily hose caused the hose to slip off the connector which caused EE's hand to go forward into the machine frame.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.