ACTIVE / CONTROLLER PORTFOLIO

Shari Morris

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0203080

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
DTS Sands- Bag Plant3304512 · Active6/8 quarters reportedJackson, OHSurface · MSHA: Sand, Industrial NEC024,9331082188.0
DTS Sands - Beaver Mine3304427 · Active6/8 quarters reportedPike, OHSurface · MSHA: Ground Silica026,50118156.0

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

126

57 significant & substantial (S&S)

  1. 2025 Q112
  2. 2025 Q212
  3. 2025 Q30
  4. 2025 Q432
  5. 2026 Q14
  6. 2026 Q252
  7. 2026 Q314
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

53,914.00

115 of 126 violations with amounts

  1. 2025 Q12,697
  2. 2025 Q23,780
  3. 2025 Q3—
  4. 2025 Q435,248
  5. 2026 Q1517
  6. 2026 Q211,068
  7. 2026 Q3604
  8. 2026 Q4 *—

On-site inspection hours

244.00

18 inspections · 18 with hours

  1. 2025 Q145.50
  2. 2025 Q217.00
  3. 2025 Q39.25
  4. 2025 Q442.00
  5. 2026 Q141.75
  6. 2026 Q255.25
  7. 2026 Q333.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11262,697.0000245.5
2025-Q21283,780.0000217.0
2025-Q300—1019.3
2025-Q4321435,248.0010342.0
2026-Q142517.0000541.8
2026-Q2522511,068.0000255.3
2026-Q3142604.0010333.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5074962
    DTS Sands- Bag Plant · 3304512

    56.14100(c) · S&S · $215.00 proposed

  2. inspection6930473
    DTS Sands- Bag Plant · 3304512

    Compliance Follow-up Inspection · 10.5 on-site hours

  3. inspectionF0376C9
    DTS Sands- Bag Plant · 3304512

    Compliance Follow-up Inspection · 2.3 on-site hours

  4. inspectionF0376C4
    DTS Sands- Bag Plant · 3304512

    Spot Inspection · 3.0 on-site hours

  5. inspectionF0376C3
    DTS Sands- Bag Plant · 3304512

    Verbal Hazard Complaint Inspections · 2.0 on-site hours

  6. violation5073180
    DTS Sands- Bag Plant · 3304512

    50.20(a) · $151.00 proposed

  7. violation5074938
    DTS Sands- Bag Plant · 3304512

    56.14100(d) · $151.00 proposed

  8. violation5074937
    DTS Sands- Bag Plant · 3304512

    56.14100(c) · S&S · $151.00 proposed

  9. violation5074935
    DTS Sands- Bag Plant · 3304512

    56.12008 · S&S · $336.00 proposed

  10. violation5074934
    DTS Sands- Bag Plant · 3304512

    56.14112(b) · $336.00 proposed

  11. violation5074933
    DTS Sands- Bag Plant · 3304512

    56.14112(b) · $151.00 proposed

  12. violation5074932
    DTS Sands- Bag Plant · 3304512

    56.12004 · $151.00 proposed

  13. violation5071500
    DTS Sands- Bag Plant · 3304512

    56.12018 · $151.00 proposed

  14. violation5071499
    DTS Sands- Bag Plant · 3304512

    56.14100(c) · $151.00 proposed

  15. violation5071498
    DTS Sands- Bag Plant · 3304512

    56.20003(c) · S&S · $336.00 proposed

  16. violation5071497
    DTS Sands- Bag Plant · 3304512

    56.12020 · $151.00 proposed

  17. violation5071488
    DTS Sands- Bag Plant · 3304512

    56.14107(a) · $151.00 proposed

  18. violation5071487
    DTS Sands- Bag Plant · 3304512

    56.20003(a) · $151.00 proposed

  19. violation5071486
    DTS Sands- Bag Plant · 3304512

    56.20003(a) · S&S · $398.00 proposed

  20. violation5071496
    DTS Sands- Bag Plant · 3304512

    56.18002(a) · S&S · $7,676.00 proposed

  21. violation5071495
    DTS Sands- Bag Plant · 3304512

    56.12004 · $151.00 proposed

  22. violation5071494
    DTS Sands- Bag Plant · 3304512

    56.14107(a) · $151.00 proposed

  23. violation5071493
    DTS Sands- Bag Plant · 3304512

    56.11002 · S&S · $1,320.00 proposed

  24. violation5071492
    DTS Sands- Bag Plant · 3304512

    56.20003(a) · $151.00 proposed

  25. violation5071491
    DTS Sands- Bag Plant · 3304512

    56.11002 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.