ACTIVE / CONTROLLER PORTFOLIO

Sev.en Global Investments a.s.

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0158381

MINE PORTFOLIO

30 of 30 mines and facilities

2025-01-01 – 2026-10-28. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
BEAR BRANCH 21518565 · Active6/8 quarters reportedPerry, KYUnderground · MSHA: Coal (Bituminous)497,338338,00150744,085.0
Blue Creek No. 1 UG Mine4609297 · Active6/8 quarters reportedKanawha, WVUnderground · MSHA: Coal (Bituminous)1,507,866392,63417042,053.3
Blue Creek Prep Plant4609226 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)065,86362157.3
Calvary No 811512753 · Active6/8 quarters reportedLeslie, KYUnderground · MSHA: Coal (Bituminous)410,165363,64823183,008.8
COAL BRANCH NO. 24609663 · Active6/8 quarters reportedWyoming, WVUnderground · MSHA: Coal (Bituminous)420,103175,37911721,127.8
Coal Clean Prep Plant4608571 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)0138,059681343.3
Combs Branch Job1516883 · Active6/8 quarters reportedPerry, KYSurface · MSHA: Coal (Bituminous)273,49584,771222374.5
EAGLE #3 MINE4609427 · Active6/8 quarters reportedWyoming, WVUnderground · MSHA: Coal (Bituminous)455,666231,25920821,391.5
East Mac & Nellie1518966 · Active6/8 quarters reportedPerry, KYSurface · MSHA: Coal (Bituminous)923,947347,7738141,235.0
Flying Eagle4609471 · Active6/8 quarters reportedWyoming, WVUnderground · MSHA: Coal (Bituminous)338,269224,95336361,428.5
Glancy Surface Mine4609377 · Active6/8 quarters reportedWyoming, WVSurface · MSHA: Coal (Bituminous)1,269,607429,971536396.3
Kentucky River Loading1513495 · Active6/8 quarters reportedPerry, KYFacility · MSHA: Coal (Bituminous)053,380470445.8
Maple Eagle East Deep Mine4609416 · Active2/8 quarters reportedFayette, WVUnderground · MSHA: Coal (Bituminous)14,3528,651410186.5
Maple Eagle No. 1 Mine4604236 · Active6/8 quarters reportedFayette, WVUnderground · MSHA: Coal (Bituminous)574,380384,812692133,274.3
Maple Eagle Preparation Plant4605145 · Active6/8 quarters reportedFayette, WVFacility · MSHA: Coal (Bituminous)0100,717390226.0
No. 76 Plant1516520 · Active6/8 quarters reportedPerry, KYFacility · MSHA: Coal (Bituminous)0104,165300726.8
NO. 771509636 · Active6/8 quarters reportedPerry, KYUnderground · MSHA: Coal (Bituminous)378,506198,79824772,599.5
NORTH EAGLE MINE4608759 · Active6/8 quarters reportedBoone, WVUnderground · MSHA: Coal (Bituminous)1,095,906433,668233172,991.3
Rocklick Preparation Plant4606448 · Active6/8 quarters reportedBoone, WVFacility · MSHA: Coal (Bituminous)0167,2211195406.0
Samples Mine Highwall Miner4609153 · Active6/8 quarters reportedKanawha, WVSurface · MSHA: Coal (Bituminous)40,46138,4743169.8
Samples Surface Mine4607178 · Active6/8 quarters reportedKanawha, WVSurface · MSHA: Coal (Bituminous)1,009,720407,562815839.0
SHM-441518978 · Active6/8 quarters reportedBoone, WVSurface · MSHA: Coal (Bituminous)200,41955,42141109.5
South Hollow Prep Plant and Loadout4603085 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)0171,258401370.8
Speed Mine4605437 · Active6/8 quarters reportedKanawha, WVUnderground · MSHA: Coal (Bituminous)740,923432,63354794,145.0
Sycamore Surface Mine4607058 · Active6/8 quarters reportedFayette, WVSurface · MSHA: Coal (Bituminous)177,583129,321231288.0
Toms Fork Prep Plant and Loadout4608465 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)039,467690292.0
WELLS PREP PLANT AND LOADOUT4605295 · Active5/8 quarters reportedBoone, WVFacility · MSHA: Coal (Bituminous)020,436170210.0
Winchester 24609615 · Active6/8 quarters reportedKanawha, WVUnderground · MSHA: Coal (Bituminous)481,891200,93312411,311.5
Winchester Peerless Rachel Mine4609258 · Active6/8 quarters reportedBoone, WVUnderground · MSHA: Coal (Bituminous)1,302,322507,900465153,518.8
Workman Branch Surface Mine4609664 · ActiveBoone, WVSurface · MSHA: Coal (Bituminous)——3069.8

LOCATION

Portfolio map

30 of 30 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-28Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

4,650

761 significant & substantial (S&S)

  1. 2025 Q1771
  2. 2025 Q2666
  3. 2025 Q3669
  4. 2025 Q4440
  5. 2026 Q1554
  6. 2026 Q2667
  7. 2026 Q3666
  8. 2026 Q4 *217

Accident records

117

2 records classified as fatality

  1. 2025 Q118
  2. 2025 Q217
  3. 2025 Q316
  4. 2025 Q417
  5. 2026 Q112
  6. 2026 Q212
  7. 2026 Q323
  8. 2026 Q4 *2

Proposed penalties · USD

4,436,221.00

4,287 of 4,650 violations with amounts

  1. 2025 Q1728,585
  2. 2025 Q2649,739
  3. 2025 Q3654,201
  4. 2025 Q4383,780
  5. 2026 Q1524,235
  6. 2026 Q2806,573
  7. 2026 Q3689,108
  8. 2026 Q4 *—

On-site inspection hours

37,681.00

752 inspections · 752 with hours

  1. 2025 Q14,891.25
  2. 2025 Q25,919.00
  3. 2025 Q35,474.50
  4. 2025 Q45,257.50
  5. 2026 Q14,539.25
  6. 2026 Q25,486.75
  7. 2026 Q35,031.25
  8. 2026 Q4 *1,081.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1771124728,585.00180924,891.3
2025-Q266695649,739.00170935,919.0
2025-Q366999654,201.001601275,474.5
2025-Q444056383,780.001701035,257.5
2026-Q155493524,235.001201134,539.3
2026-Q2667120806,573.00121965,486.8
2026-Q3666127689,108.00230975,031.3
2026-Q4 *21747—21311,081.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF00672D
    Speed Mine · 4605437

    103(i) Spot Inspections · 7.0 on-site hours

  2. violation9779119
    NO. 77 · 1509636

    75.363(b) · S&S · $1,126.00 proposed

  3. violation9779118
    NO. 77 · 1509636

    75.380(f)(1) · S&S · $1,126.00 proposed

  4. violation9779117
    NO. 77 · 1509636

    75.1731(a) · S&S · $697.00 proposed

  5. violation9779116
    NO. 77 · 1509636

    75.333(c) · $151.00 proposed

  6. violation9779115
    NO. 77 · 1509636

    75.400 · S&S · $1,431.00 proposed

  7. violation9779114
    NO. 77 · 1509636

    75.1100-2(b) · $151.00 proposed

  8. violation9779019
    BEAR BRANCH 2 · 1518565

    75.220(a)(1) · S&S · $1,431.00 proposed

  9. violation5084001
    BEAR BRANCH 2 · 1518565

    75.604(b) · S&S · $1,219.00 proposed

  10. violation5022889
    Maple Eagle No. 1 Mine · 4604236

    75.370(a)(1) · $465.00 proposed

  11. violation5026271
    Speed Mine · 4605437

    75.370(a)(1) · $336.00 proposed

  12. violation5026270
    Speed Mine · 4605437

    75.333(h) · $209.00 proposed

  13. violation9847409
    Speed Mine · 4605437

    75.515 · $6,540.00 proposed

  14. violation5025376
    Toms Fork Prep Plant and Loadout · 4608465

    77.205(b) · S&S · $313.00 proposed

  15. violation5025375
    Toms Fork Prep Plant and Loadout · 4608465

    77.205(b) · S&S · $313.00 proposed

  16. violation5025374
    Toms Fork Prep Plant and Loadout · 4608465

    41.12 · $151.00 proposed

  17. violation5029910
    Coal Clean Prep Plant · 4608571

    77.400(d) · $151.00 proposed

  18. violation5025693
    Winchester Peerless Rachel Mine · 4609258

    75.1107-16(b) · $151.00 proposed

  19. violation5025692
    Winchester Peerless Rachel Mine · 4609258

    75.604(b) · $313.00 proposed

  20. violation5025691
    Winchester Peerless Rachel Mine · 4609258

    75.400 · $151.00 proposed

  21. violation5025690
    Winchester Peerless Rachel Mine · 4609258

    72.630(b) · $151.00 proposed

  22. violation5025689
    Winchester Peerless Rachel Mine · 4609258

    75.400 · $336.00 proposed

  23. violation5025148
    Winchester Peerless Rachel Mine · 4609258

    75.220(a)(1) · $1,126.00 proposed

  24. violation5025147
    Winchester Peerless Rachel Mine · 4609258

    75.380(d)(4) · $697.00 proposed

  25. violation9838194
    Flying Eagle · 4609471

    75.220(a)(1) · $959.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-28.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-08Source checked 2026-10-28 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS2,079,704106 rows · 14 receiving plants
HEAT CONTENT · BTU/LB12,250Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.98 / 11.60Separate averages over measured receipts
DELIVERED COST · USD/TON112.3994.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *197,87612,2831.0611.83119.16
2025-Q4470,06912,3501.0410.95114.11
2026-Q1495,77112,2480.9511.36109.36
2026-Q2647,01612,1990.9011.99109.55
2026-Q3 *268,97212,1791.0512.08116.33
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-08EIA row 13371 · preliminaryKENTUCKY RIVER LOADING1513495Cross130 · SC · BLACKHAWK COAL SALES, LLC13,498111.4311,6701.9013.60ContractBITRail
2026-08EIA row 13374 · preliminaryKENTUCKY RIVER LOADING1513495Cross130 · SC · BLACKHAWK COAL SALES, LLC12,780113.2611,9301.7412.70ContractBITRail
2026-08EIA row 13607 · preliminary#771509636Cooper1384 · KY · BLACKHAWK COAL SALES, LLC5,030123.4713,4701.686.40SpotBITTruck
2026-08EIA row 13761 · preliminaryBC #1 DEEP MINE4609297Roxboro2712 · NC · BLACKHAWK COAL SALES, LLC24,205122.9411,9040.9413.80ContractBITRail
2026-08EIA row 13887 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,750128.3412,2300.8911.70ContractBITRail
2026-08EIA row 13895 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC25,253132.1912,6350.8310.50ContractBITRail
2026-08EIA row 13952 · preliminaryFIVE MILE PREP PLT & REFUSE IM4609226John E Amos3935 · WV · BLACKHAWK MINING LLC11,16486.5311,9750.9013.00ContractBITRiver
2026-08EIA row 13973 · preliminaryFIVE MILE PREP PLT & REFUSE IM4609226Mitchell (WV)3948 · WV · BLACKHAWK MINING LLC9,68887.6812,2050.9211.24ContractBITRiver
2026-08EIA row 14691 · preliminaryKENTUCKY RIVER LOADING1513495Covington Facility50900 · VA · COAL ENERGY7,831—Not published12,7000.809.90ContractBITRail / Truck
2026-07EIA row 11400 · preliminaryKENTUCKY RIVER LOADING1513495Cross130 · SC · BLACKHAWK MINING LLC26,431113.4512,0051.6212.60ContractBITRail
2026-07EIA row 11618 · preliminary#771509636Cooper1384 · KY · BLACKHAWK COAL SALES, LLC5,043125.3013,6701.385.90SpotBITTruck
2026-07EIA row 11771 · preliminaryBC #1 DEEP MINE4609297Roxboro2712 · NC · BLACKHAWK COAL SALES, LLC48,575122.2111,8720.8613.80ContractBITRail
2026-07EIA row 11899 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,532129.5112,6600.899.80ContractBITRail
2026-07EIA row 11905 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC12,309133.5012,5800.9110.40ContractBITRail
2026-07EIA row 11906 · preliminaryWELLS PREPARATION PLANT4605295Williams3298 · SC · BLACKHAWK MINING LLC11,279134.4612,4200.679.60ContractBITRail
2026-07EIA row 11965 · preliminaryFIVE MILE PREP PLT & REFUSE IM4609226John E Amos3935 · WV · BLACKHAWK MINING LLC24,92888.0612,0000.8312.98ContractBITRiver
2026-07EIA row 11980 · preliminaryFIVE MILE PREP PLT & REFUSE IM4609226Mitchell (WV)3948 · WV · BLACKHAWK MINING LLC5,67687.2111,9600.7613.08ContractBITRiver
2026-06EIA row 9493 · preliminaryKENTUCKY RIVER LOADING1513495Cross130 · SC · BLACKHAWK MINING LLC13,535116.0011,8901.5712.00ContractBITRail
2026-06EIA row 9722 · preliminary#771509636Cooper1384 · KY · BLACKHAWK COAL SALES, LLC791125.3013,6701.485.60SpotBITTruck
2026-06EIA row 9723 · preliminary#771509636Cooper1384 · KY · BLACKHAWK COAL SALES, LLC5,027125.2113,6601.445.90SpotBITTruck
2026-06EIA row 9872 · preliminaryBC #1 DEEP MINE4609297Roxboro2712 · NC · BLACKHAWK COAL SALES, LLC49,117119.5211,8670.7613.70ContractBITRail
2026-06EIA row 10001 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,985130.0612,2100.8312.60ContractBITRail
2026-06EIA row 10009 · preliminaryWELLS PREPARATION PLANT4605295Williams3298 · SC · BLACKHAWK MINING LLC12,925134.9812,5700.6810.20ContractBITRail
2026-06EIA row 10010 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC25,717132.6612,8950.849.60ContractBITRail
2026-06EIA row 10067 · preliminaryFIVE MILE PREP PLT & REFUSE IM4609226John E Amos3935 · WV · BLACKHAWK MINING LLC56,40388.8412,1800.7912.10ContractBITRiver
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_08_2026_22OCT2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-28. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON111.33Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS8,320,270Allocated from published county sales
ESTIMATED COAL REVENUE · USD926,256,360Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED95.1%16 of 19 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Blue Creek No. 1 Ug Mine4609297 · Kanawha, West Virginia1,210,98099.791,239,949123,734,476County allocation estimate41.65% of eligible county production5 eligible mines / 5 sales respondents
Glancy Surface Mine4609377 · Wyoming, West Virginia761,574151.85775,953117,828,520County allocation estimate11.51% of eligible county production18 eligible mines / 18 sales respondents
North Eagle Mine4608759 · Boone, West Virginia772,997101.17834,20984,396,942County allocation estimate26.82% of eligible county production9 eligible mines / 9 sales respondents
Winchester Peerless Rachel Min4609258 · Boone, West Virginia766,938101.17827,67083,735,412County allocation estimate26.61% of eligible county production9 eligible mines / 9 sales respondents
East Mac & Nellie1518966 · Perry, Kentucky672,86298.19794,46778,008,717County allocation estimate46.46% of eligible county production4 eligible mines / 4 sales respondents
Samples Surface Mine4607178 · Kanawha, West Virginia743,56999.79761,35675,975,755County allocation estimate25.57% of eligible county production5 eligible mines / 5 sales respondents
Speed Mine4605437 · Kanawha, West Virginia572,37399.79586,06558,483,437County allocation estimate19.69% of eligible county production5 eligible mines / 5 sales respondents
Bear Branch 21518565 · Perry, Kentucky447,75898.19528,68051,911,131County allocation estimate30.92% of eligible county production4 eligible mines / 4 sales respondents
Maple Eagle No. 1 Mine4604236 · Fayette, West Virginia400,254129.97399,27051,893,062County allocation estimate13.78% of eligible county production9 eligible mines / 9 sales respondents
Eagle #3 Mine4609427 · Wyoming, West Virginia308,798151.85314,62847,776,331County allocation estimate4.67% of eligible county production18 eligible mines / 18 sales respondents
Flying Eagle4609471 · Wyoming, West Virginia253,053151.85257,83139,151,626County allocation estimate3.83% of eligible county production18 eligible mines / 18 sales respondents
Sycamore Surface Mine4607058 · Fayette, West Virginia226,761129.97226,20329,399,638County allocation estimate7.81% of eligible county production9 eligible mines / 9 sales respondents
No. 771509636 · Perry, Kentucky226,88998.19267,89426,304,532County allocation estimate15.67% of eligible county production4 eligible mines / 4 sales respondents
Winchester 24609615 · Kanawha, West Virginia240,31799.79246,06624,554,904County allocation estimate8.27% of eligible county production5 eligible mines / 5 sales respondents
Coal Branch No. 24609663 · Wyoming, West Virginia138,455151.85141,06921,421,356County allocation estimate2.09% of eligible county production18 eligible mines / 18 sales respondents
Combs Branch Job1516883 · Perry, Kentucky100,75098.19118,95811,680,520County allocation estimate6.96% of eligible county production4 eligible mines / 4 sales respondents
Calvary No 811512753 · Leslie, Kentucky348,428———County sales or price not published2 eligible mines / 2 sales respondents
Kentucky River Loading1513495 · Perry, Kentucky098.19——Preparation plant4 eligible mines / 4 sales respondents
No. 76 Plant1516520 · Perry, Kentucky098.19——Preparation plant4 eligible mines / 4 sales respondents
Shm-441518978 · Boone, West Virginia23,310101.17——Below EIA sales-reporting threshold9 eligible mines / 9 sales respondents
South Hollow Prep Plant And Lo4603085 · Kanawha, West Virginia099.79——Preparation plant5 eligible mines / 5 sales respondents
Maple Eagle Preparation Plant4605145 · Fayette, West Virginia0129.97——Preparation plant9 eligible mines / 9 sales respondents
Wells Prep Plant And Loadout4605295 · Boone, West Virginia0101.17——Preparation plant9 eligible mines / 9 sales respondents
Rocklick Preparation Plant4606448 · Boone, West Virginia0101.17——Preparation plant9 eligible mines / 9 sales respondents
Toms Fork Prep Plant And Loado4608465 · Kanawha, West Virginia099.79——Preparation plant5 eligible mines / 5 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

6 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.