Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
Flying Eagle · 460947130 CFR 75.503 · $177.00 proposed penalty
Electric conductor; capacity and insulation.
Flying Eagle · 460947130 CFR 75.513 · $177.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · $1,126.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $504.00 proposed penalty
Impoundment Spot Inspection
WELLS PREP PLANT AND LOADOUT · 46052953.3 on-site hours reported
Maintenance of diesel-powered equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1914(a) · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $398.00 proposed penalty
Installation of water sprinkler systems; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1101-7(c) · $165.00 proposed penalty
Quantity and location of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-2(b) · $165.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $4,047.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.216-3(a)(1) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Speed Mine · 460543730 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $432.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Speed Mine · 460543730 CFR 75.518-1 · $209.00 proposed penalty
Identification of circuit breakers.
Speed Mine · 460543730 CFR 75.904 · $193.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Speed Mine · 460543730 CFR 75.518-1 · $209.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $432.00 proposed penalty
Automatic fire warning devices; actions and response.
Speed Mine · 460543730 CFR 75.1103-5(a)(2) · $398.00 proposed penalty
Mechanical equipment guards.
Speed Mine · 460543730 CFR 75.1722(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1731(a) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Glancy Surface Mine · 460937730 CFR 77.1607(b) · Significant and substantial (S&S) · $465.00 proposed penalty
Loading and haulage equipment; operation.
Glancy Surface Mine · 460937730 CFR 77.1607(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester 2 · 460961530 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Verbal Hazard Complaint Inspections
Speed Mine · 46054375.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.